|
U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT
Wyoming |
Gateway West Transmission Line Project
The draft Environmental Impact Statement (EIS) has been released to the public for comment and review, with publication of the Notice of Availability in the Federal Register on July 29, 2011. This began a 90-day comment period. The public comment period closed on Friday, October 28, 2011. How to access the draft EIS:
Draft EIS
The draft EIS is presented below to accommodate slower and faster internet connection speeds. Please note the smaller PDFs have been optimized for ease of access and in some cases large graphics or images may have reduced resolution. If you have difficulty viewing the maps and cannot download the large PDFs, please request a CD or call the project information line at 1-800-380-5828. This document contains minor corrections to sections of the draft EIS.
Main Text
Appendices
|
| USA Gov | No Fear Act | DOI | Disclaimer | About BLM | Notices | Get Adobe Reader ® |
| Privacy Policy | eFOIA | Kids Policy | Contact Us | Accessibility | Site Map | Home |