2008-2009 Wildlife Exceptions
Exception requests that span extensive lengths of time are not
fully granted because the wildlife staff cannot adequately analyze impacts over
such long periods of time. Such requests are sometimes given partial grants
that enable work over shorter periods of time and are then reevaluated for extensions
to the original exception. This table includes the original request and each
extension evaluated for each location.
COA Legend
BO = burrowing owl
FEHA = ferruginous hawk
BG CWR = big game crucial winter range
SG = sage grouse
CWR = crucial winter range
BE = bald eagle
For further information or to obtain copies of completed documents, please contact
John Huston at 307-367-5385.
|
Number
|
COA |
Company |
Location / Wells |
Requested Action |
Action date |
Action Status |
Requested dates |
Dates excepted |
Lease/ROW |
Town(N) |
Range(W) |
Sec. |
Remarks |
|
1
|
BG CWR |
RY Timber |
BLM land adjacent to Robert's Property |
access road to private timber sale |
10/15/08 |
Granted |
11/15/08 to 05/01/09 |
11/15/2008 to 04/30/2009 |
WYW172062 |
36 |
112 |
15/22 |
|
|
2
|
BG CWR, SG, Raptor |
Questar |
Mesa 3-20 pad |
drill 16 wells from this pad |
10/29/08 |
Granted |
10/15/08 to 01/15/2010 |
10/29/2008 to 2/01/2009 |
WYW 015315 |
32 |
109 |
16,17,20 |
This location has been analyzed in the winter drilling EA |
|
3
|
BG CWR, SG, Raptor |
Questar |
Mesa 11-20 pad |
drill 22 wells from this pad |
10/29/08 |
Granted |
10/15/08 to 07/15/2010 |
10/29/2008 to 10/01/2009 |
WYW 015315 |
32 |
109 |
15, 16,17,18,19,20,21,22 |
This location has been analyzed in the winter drilling EA |
|
4
|
BG CWR, SG, Raptor |
Questar |
Mesa 8-19 |
drill 16 wells from this pad |
10/29/09 |
Granted |
10/15/08 to 01/15/2010 |
10/29/2008 to 04/01/2009 |
WYW 015315 |
32 |
109 |
15,16,17.18,19,20.21,22 |
This location has been analyzed in the winter drilling EA |
|
5
|
BG CWR, SG, Raptor |
Questar |
Mesa 12-21 |
drill 8 wells from this pad |
10/29/08 |
Granted |
10/15/08 to 04/15/2009 |
10/29/2008 to 6/01/2009 |
WYW 015315 |
32 |
109 |
15,16,17.18,19,20.21,22 |
This location has been analyzed in the winter drilling EA |
|
6
|
Bald Eagle Winter Use |
Ultra |
RS 1A1-22D and RS 4C1-23 same pad |
drill out frac plugs |
11/01/08 |
Granted |
11/1/2008 to 11/16/08 |
11/01/2008 to 11/15/2008 |
WYE 026025 |
31 |
109 |
23 |
|
|
7
|
Bald Eagle Winter Use |
Ultra |
RS 14B1-14D |
drill out frac plugs |
11/01/08 |
|
11/1/2008 to 11/16/08 |
|
WYE 026025 |
31 |
109 |
14 |
|
|
8
|
BO, FEHA,BG CWR, SG |
Shell |
Mesa 11-34 |
drill 10 wells from this pad |
10/15/08 |
Granted |
10/15/08 to 07/15/08 |
11/15/2008 to 08/15/2009 |
WYW 06286 |
32 |
109 |
34 |
|
|
9
|
BO, FEHA,BG CWR, SG |
Shell |
Mesa 13-35 |
Drill 6 wells from this pad |
10/15/08 |
Granted |
10/15/08 to 06/01/08 |
11/15/2008 to 03/15/2009 |
WYW 06286 |
32 |
109 |
35 |
|
|
10
|
FEHA, BG CWR, SG |
Shell |
Mesa 5-26 |
Drill 18 wells from this pad |
10/15/08 |
Granted |
10/15/08 to 10/01/09 |
11/15/2008 to 07/31/2009 |
WYW 116265 |
32 |
109 |
26 |
|
|
11
|
FEHA,BG CWR, SG |
Shell |
RS 1-3 |
drill 8 wells from this pad |
10/15/08 |
Granted |
10/15/08 to 09/01/2009 |
11/15/2008 to 07/31/2009 |
WYW 06270 |
31 |
109 |
3 |
|
|
12
|
BO,BG CWR, SG |
Shell |
WB 13-14 |
Drill 12 wells from this pad |
10/15/08 |
Granted |
10/15/08 to 12/31/09 |
03/15/2008 to 08/15/2009 |
WYW 015314 |
39 |
109 |
14 |
|
|
13
|
BO, BG CWR, SG |
Shell |
MS 12-33 |
drill 8 wells from this pad |
10/15/088 |
Granted |
10/15/2008 to 03/01/2010 |
11/15/2008 to 08/15/2009 |
WYW 118165 |
32 |
109 |
33 |
|
|
14
|
BO, BG CWR, SG |
Shell |
RS 11-2 |
Drill 12 wells from this pad |
10/15/08 |
Denied |
10/15/2008 to 03/15/2010 |
|
WYW 06270 |
31 |
109 |
2 |
|
|
15
|
BO, BG CWR, SG |
Shell |
BO 1-32 |
drill 9 wells from this pad |
01/01/08 |
Granted |
11/1/2008 to 10/31/09 |
03/15/2009 to 8/15/2009 |
WYW 015316 |
31 |
108 |
32 |
|
|
16
|
BG CWR, SG |
Shell |
MS 5-33 |
Drill 20 wells from this pad |
05/01/09 |
|
05/2009 to 01/2011 |
|
WYW 118165 |
32 |
109 |
33 |
These APD's have not been submitted yet. |
|
17
|
BG CWR, SG |
Shell |
Mesa 1-29 |
drill 10 wells from this pad |
10/15/08 |
Granted |
10/15/08 to 08/31/09 |
11/15/2008 to 07/15/2009 |
WYW 118165 |
32 |
109 |
29 |
|
|
18
|
BG CWR, SG |
Shell |
Antelope 1-5 |
Drill 6 wells from this pad |
04/01/09 |
Withdrawn |
04/01/2009 to 12/31/2009 |
|
WYW 150655 |
29 |
107 |
5 |
|
|
19
|
BG CWR, SG |
Shell |
Mesa 12-34 |
drill 10 wells from this pad |
10/15/08 |
Granted |
10/15/2008 to 10/31/2009 |
11/15/2008 to 08/15/2009 |
WYW 06286 |
32 |
109 |
34 |
|
|
20
|
BG CWR |
Shell |
RS 8-3 |
facilities for the Riverside 1-3 |
10/15/08 |
Granted |
10/15/2008 to 09/30/2008 |
11/15/2008 to 04/30/2009 |
WYW 06269 |
31 |
109 |
3 |
|
|
21
|
BG CWR, SG |
Shell |
RS 12-3 |
completion |
11/15/08 |
Granted |
11/15/08 to 12/31/08 |
11/15/2008 to 12/31/2008 |
WYW 06270 |
31 |
109 |
3 |
|
|
22
|
Bald Eagle Winter Use |
Ultra |
RS 3B-13D |
drill out frac plugs |
11/01/08 |
Granted |
11/1/2008 to 11/16/08 |
11/01/2008 to 11/15/2008 |
WYE 06269 |
31 |
109 |
13 |
|
|
23
|
BG CWR |
Jonah Gas |
Mesa 12-27 |
275' of natural gas pipeline |
11/07/08 |
Granted |
11/07/08-11/28/08 |
11/11/2008 to 12/05/2008 |
WYW 175447 |
32 |
109 |
27 |
|
|
24
|
Raptor |
Ultra |
Mesa 9-34 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 TO 08/15/2009 |
WYW 06286 |
32 |
109 |
34 |
|
|
25
|
Raptor |
Ultra |
Riverside 2-2 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 to 08/15/2008 |
WYW 06270 |
31 |
109 |
2 |
|
|
26
|
Raptor, BO |
Ultra |
Mesa 9-28 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 TO 08/15/2009 |
WYW 06286 |
32 |
109 |
28 |
|
|
27
|
BO |
Ultra |
Mesa 10-33 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2009 TO 08/15/2009 |
WYW 06286 |
32 |
109 |
33 |
|
|
28
|
Raptor |
Ultra |
Mesa 15-27 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 TO 08/15/2009 |
WYW 06286 |
32 |
109 |
27 |
|
|
29
|
Raptor, BO |
Ultra |
Riverside 4-11 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 to 08/15/2009 |
WYW 06270 |
31 |
109 |
11 |
|
|
30
|
BO |
Ultra |
Riverside 1-4 Simops |
Drilling, completion, production, pipeline, construction opps |
04/01/09 |
Granted |
04/01/09-08/15/09 |
11/15/2008 to 08/15/2009 |
WYW 143046 |
31 |
109 |
4 |
|
|
31
|
Raptor, BO |
Ultra |
Riverside 3-3 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
|
02/01/09-07/31/09 |
|
WYW 06270 |
31 |
109 |
3 |
|
|
32
|
Raptor |
Ultra |
Mesa 12-27 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 TO 08/15/2009 |
WYW 06286 |
32 |
109 |
27 |
|
|
33
|
Raptor |
Ultra |
Mesa 1-33 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
Granted |
02/01/09-07/31/09 |
11/15/2008 TO 08/15/2009 |
WYW 06286 |
32 |
109 |
33 |
|
|
34
|
Raptor, BO |
Ultra |
Riverside 16-3 Simops |
Drilling, completion, production, pipeline, construction opps |
02/01/09 |
|
02/01/09-07/31/09 |
|
WYW 06270 |
31 |
109 |
3 |
|
|
35
|
BG CWR |
Questar |
Mesa 3-22 |
Construction, drill 34 wells, pipe moving rigs |
10/30/08 |
Granted |
10/30/08-12/31/08 |
10/30/2008 to 12/01/2008 |
WYW 015317 |
32 |
109 |
22 |
|
|
36
|
BE, CWR |
EOG |
GRBU T 200-30D |
Drill and complete well |
11/03/08 |
Cancelled |
11/01/08-11/19/08 |
|
WYW025410 |
27 |
112 |
30 |
|
|
37
|
CWR |
Exxon |
HB T33X-18G1, HB T32X-32G |
Return to production |
11/07/08 |
Denied |
11/15/018-12/03/08 |
|
WYE024730, 021976 |
27 |
113 |
18,32 |
|
|
38
|
CWR |
Cimarex |
Riley Ridge #20-14 |
Request for extension of drilling window |
11/13/08 |
Granted |
11/15/08-12/15/08 |
11/15/2008 to 12/15/2008 |
WYW60620,59398 |
29 |
114 |
17 |
|
|
39
|
BG CWR, SG |
Questar |
Mesa 3-20, Mesa 11-20, Mesa 15-20, Mesa 16-19, Mesa 8-19, Mesa 3-21,
Mesa 5-21, Mesa 7-21, Mesa 12-21, Mesa 3-22, Mesa 7-22 |
Drilling, completion, production, pipeline, construction opps |
11/19/08 |
Granted |
11/15/08-7/15/09 |
11/15/2008 to 107/15/2009 |
WYW 015315, WYW 015317 |
32 |
109 |
19, 20, 21, 22 |
All requested per Anticline ROD through stip dates (Nov. 15- July 15
2009). Some of these pads were previously requested for exceptions but
not through the entire grouse or big game stip. That is why Questar resubmitted
them. |
|
40
|
BG |
Shell |
Riverside 12-25, well 14b-25DX |
Run into the hole and set a plug, high water to gas ratio. |
11/21/2008 |
Granted |
11/15/08-4/30/2009 |
11/24/2008 to 12/07/2008 |
WYW 06269 |
31 |
109 |
25 |
Activity will take 1 day. Granted for 2 weeks to allow response. |
|
41
|
BG |
Shell |
Stewart Point 16a-6D, SP 2a-7D |
Install a 10K tree (aka tubing spool) to monitor pressure |
11/21/2008 |
Granted |
11/15/08-4/30/2009 |
11/24/2008 to 12-07-2008 |
WYW 130234 |
33 |
109 |
6 & 7 |
A four hour operation. Granted for 2 weeks to allow response. |
|
42
|
BG |
Anschutz |
Mesa 11-19 |
Completion, frac, mill out plug and clean up |
12/7/2008 |
Granted |
12/7/08-12/30/2008 |
12-07-2008 to 12-31-2009 |
WYW 135123 |
32 |
109 |
19 |
Per the Anticline ROD |
|
43
|
BG |
QGM |
Gobbler's Knob Compressor Station |
Finish construction activities near Gobbler's Knob Compressor Station |
12/01/08 |
Granted |
12/1/2008-12/15/2008 |
11/25/2008 to 12/15/2008 |
WYW 152601 |
31 |
109 |
3 |
|
|
44
|
BG |
QGM |
Gobbler's Knob Compressor Station |
Construct the natural gas pipeline for Anshutz |
12/01/08 |
Granted |
12/1/2008-12/8/2008 |
12/01/2008 to 12/08/2008 |
WYW 175506 |
32 |
109 |
19 & 20 |
|
|
45
|
BG |
Exxon |
HB T65-5G |
Drill out Bridge Plug and return to production |
11/13/08 |
Granted |
11/15/08-11/19/08 |
11/15/2008 to 11/19/2008 |
WYE025792 |
26 |
113 |
5 |
|
|
46
|
BG, SG, FH, BO, MP |
Shell |
RS 12-3, RS 11-4, RS 8d-24D, MS 5-26, MS 13-35, MS 1-29, MS 12-33, BD
1-32, BD 14-32, NP 11-8, NP 12-8, NP 13-8 |
Routine production log tests |
11/05/08 |
Granted |
11/15/08-8/15/09 |
11/15/08-8/15/08 |
WYW 06270, 06286, 144994, 118165, 116265, 130234, 015316 |
31, 32, 33 |
108, 109 |
3, 4, 24, 26, 35, 29, 33, 32, 8 |
|
|
47
|
BG, SG, Raptor |
Shell |
Mesa 1-27 |
Close reserve pits, move facilities, drill and complete wells |
12/01/08 |
Granted |
11/15/08-7/31/09 |
12/02/2008 to 02/28/2009 |
WYW 116265 |
32 |
109 |
27 |
Exceptions to BG and SG per the Anticline ROD |
|
48
|
BG, SG |
Ultra |
RS 2-2, 5-2, 16-3, 3-3, 1-4, 1A1-9, 4-11, MS 10-35, 9-34, 4-34, 10-33,
1-33, 12-27, 15-27, 9-28 |
Drill and complete wells |
11/26/08 |
Granted |
11/15/08-7/15-09 |
12/02/2008 to 7/15/2008 |
|
|
|
|
|
|
49
|
Raptor |
Ultra |
Riverside 5-2 |
Drilling, completion, production, pipeline, construction opps |
11/26/08 |
Granted |
2/1/09-7/31/09 |
03/01/2008 to 07/31/2008 |
WYW 06270 |
31 |
109 |
2 |
|
|
50
|
Raptor |
Ultra |
Mesa 4-34 |
Drilling, completion, production, pipeline, construction opps |
11/26/08 |
Granted |
2/1/09-7/31/09 |
03/01/2001 to 07/31/2009 |
WYW 06286 |
32 |
109 |
34 |
|
|
51
|
Big Game |
Shell |
Riverside 12-3 |
Extend exception through 1/10/2009 to complete floback |
12/08/08 |
Granted |
1/1/09-1/10/09 |
1/1/09-1/10/09 |
WYW 06270 |
31 |
109 |
3 |
Per the Anticline ROD |
|
52
|
BG, pygmy, BFF |
JGG |
Boulder 9-19 |
Install 2127 feet of 6" natural gas pipeline. |
12/15/08 |
Granted |
|
|
WYW 175526 |
31 |
108 |
19 |
|
|
53
|
BG, BAEA winter/nesting |
Ultra |
Lizard Head 11-8 WDW |
Installation of facility for WDW |
01/09/09 |
Denied |
3/01/09-3/14/09 |
|
WYW 172026 |
31 |
108 |
8 |
|
|
54
|
Raptor |
Ultra |
Boulder 4-33 |
Fraccing, flowback and workover operations |
01/12/09 |
Granted |
2/1/09-2/28/09 |
2-1-2009 to 2-28-2009 |
WYW 0118159 |
31 |
108 |
33 |
|
|
55
|
Raptor |
Questar |
Mesa 3-20, Mesa 11-20, Mesa 12-21 |
Continue drilling, move rig off pad, completions, production |
01/29/09 |
Granted |
3/1/2009 to 7/31/2009 |
2-04-2009 to 07/31/2009 |
WYW 015315 |
32 |
109 |
20 |
Per the Anticline ROD, once on a pad, stay on a pad |
|
56
|
Raptor and Mig. Birds |
Questar |
Mesa 8-19 |
Continue drilling, move rig off pad, completions, production |
01/29/09 |
Granted |
3/1/2009 to 7/31/2009 |
02/04/2009 to 09-01-2009 |
WYW 015315 |
32 |
109 |
20 |
Per the Anticline ROD, once on a pad, stay on a pad |
|
57
|
SG, Raptor, BO |
EnCana |
Block Clearance |
Drilling, completion, production, reclamation |
01/28/09 |
Granted |
3/1/2009 to 8/15/2009 |
3/1/2009 to 8/5/2009 |
|
|
|
|
|
|
58
|
SG, BO |
EnCana |
JF 26-18 and 54-18, YP 75-13 and 79-13 |
Drilling, completion, production, reclamation |
01/28/09 |
Granted |
3/15/2009 to 7/15/2009 |
3-15-2009 to 8-15-2009 |
WYW125943 |
28 |
108 |
18, 13 |
|
|
59
|
SG, Raptor |
JGG |
Antelope 15-4 and RB 15-29 pipeline |
Removal of 3400' 4" and 6000' of 12" pipeline that are out of use |
02/02/09 |
Partial |
2/15/2009-3/31/2009 |
02-04-2009 to 03-14-2009 |
WYW 146707, 148749 |
30 |
107 |
23, 31, 32 |
|
|
60
|
Raptor, BG |
Cellular Inc. |
Pinedale/ Mt. Airy tower |
Analyze and map tower |
02/05/09 |
Denied |
2/12/09 to 2/14/09 |
|
WYW146095 |
33 |
110 |
12 |
|
|
61
|
SG, Raptor, BO |
BP |
Jonah Block Clearance |
Drilling, completion, production, reclamation |
02/12/09 |
Granted |
3/1/2009 to 8/15/2009 |
3-01-2009 to 08/15/2009 |
|
|
|
|
|
|
62
|
BG |
JGG |
Mesa 1-27 |
install a Pod and 4" meeting, removal of the exisitng 3" meter and reset
pipeline launcher |
02/13/09 |
Granted |
2/23/2009 to 2/27/2009 |
2/23/2009 to 2-27-2009 |
WYW 157830 |
32 |
109 |
27 |
To compensate for wells drilled by Shell during winter per ROD. |
|
63
|
BG, FH |
QGM |
Mesa 11-20 pad |
loop pipeline |
02/17/09 |
Granted |
3/2/09 to 3/10/09 |
3/2/2009 to 3/10/2009 |
WYW 175508 |
32 |
109 |
20 |
to compensate for wells drilled this winter on same location per ROD |
|
65
|
BG, SG, FH |
SWEPI LP |
Mesa 1-27 |
Remove old facilities, placement of new facilities, flowline work |
02/18/09 |
Granted |
2/20/09 to 3/15/09 |
3/01/2009 to 3/15/2009 |
WYW 116265 |
32 |
109 |
27 |
extension of previous exception due to equipment not being ordered |
|
66
|
FH |
Ultra |
Boulder 13B1-34D |
Fraccing, flowback and workover operations |
03/01/09 |
Granted |
03/01/09 to 03/15/09 |
03/01/09 to 03/15/09 |
WYW 118159 |
31 |
108 |
34 |
|
|
67
|
FH |
Ultra |
Warbonnet 3D1-3D, 6A1-3D, 8C1-3D, 8D1-3D |
Fraccing, flowback and workover operations |
03/01/09 |
Granted |
03/01/09 to 03/15/09 |
03/01/09 to 03/15/09 |
WYW 016162 |
30 |
108 |
3 |
|
|
68
|
FH |
Ultra |
MS 9-34 and 4-34,(15a1-34D, 15a1-34D) |
Rig Down Move off |
03/01/09 |
Granted |
09/01/09 to 04/10/09 |
|
WYW 06286 |
32 |
109 |
34 |
change in previous exception, rig contracts could not be renegotiated |
|
69
|
SG |
JGG |
Rainbow 6-30 |
tie in, install launcher and receivers and set meter for Ultra's RB
6-30 |
03/16/09 |
Granted |
03/16/09 to 03/20/09 |
3/15/2009 - 6/15/2009 |
WYW 173112 |
30 |
107 |
30 |
Ultra drilling on this location and JGG needs to accommodate gas |
|
70
|
SG nest and winter |
Ultra and MGR |
Warbonnet 11-23: 11B1-23D |
completions, production, pipeline, and construction operation |
03/15/09 |
Granted |
03/15/09 to 06/15/09 |
3/15/2009 - 06/15/2009 |
WYW 118157 and WYW 175342 |
30 |
108 |
23 |
Project within Core development area, comports with ROD implementation |
|
71
|
SG and BO |
Ultra |
Rainbow 6C-30 and 7A1-30D |
drilling completion, production, pipeline, and construction |
03/15/09 |
Granted |
03/15/09 to 06/15/09 |
3-15-2009 - 6-15-2009 |
WYW 016155 |
30 |
107 |
30 |
Project within Core development area, comports with ROD implementation |
|
72
|
FH |
SWEPI LP |
Mesa 12-35 |
Finish drilling by 3/22/09. Rig down move off by 3/31/09. Completions
through 7/31/09 |
03/15/09 |
Granted |
3/15/09 to 7/31/09 |
3/12/2009 - 3/31/2009 |
WYW 06286 |
32 |
109 |
35 |
Pad approved per ROD, extension of previous exception, behind schedule
with drilling |
|
73
|
|
Pacifice Corp. |
230KV Paradise |
To drill 10 geotechnical borings to investigate the design of substation |
03/17/09 |
Denied |
3/16/2009 to 3/27/2009 |
|
WYW175423 |
31 |
109 |
24 |
To drill 10 geotechnical borings |
|
74
|
SG and BO |
BP |
JIDP |
Finish completing work at the WDW#3 facility |
ASAP |
Granted |
ASAP to 04/01/2009 |
ASAP to 04/01/2009 |
|
29 |
108 |
10 |
Activity must take place during daylight hours. |
|
75
|
BG |
SWEPI LP |
North Pinedale 11-8D, 12-8D and 13-8D |
Installation of tubing for 3 wells |
03/18/09 |
Granted |
3/25/09 to 4/04/2009 |
03/25/2009 to 4-04-2009 |
WYW130234 |
33 |
109 |
8 |
The wells are slugging and causing the VOC stacks to shut down. Tubing
will fix problem |
|
76
|
BO |
EnCana |
SHB 60-27 and 74-27 |
Finish Completions |
03/16/09 |
Granted |
4/1/09 to 4/5/09 |
4-01-2009 to 4/05/2009 |
WYW 102899 |
29 |
109 |
27 |
|
|
78
|
FH |
SWEPI LP |
SWEPI LP North Liquids Gathering Facility |
Soil samples |
03/16/09 |
Denied |
3/21/09 to 4/03/09 |
|
None |
|
|
|
|
|
79
|
SG and BO |
BP |
SHB 25-22 |
Cover electrical conduit in ditch with red cement and back fill open
trench |
03/18/09 |
Granted |
ASAP for 5 days |
3/18/2009 3/31/2009 |
WYW 127749 |
29 |
108 |
22 |
|
|
80
|
BG, SG, FH, BO |
SWEPI LP |
Mesa 13-35 |
Precompletions work |
03/23/09 |
Denied |
4/6/09 to 4/9/09 |
|
wyw 06286 |
32 |
109 |
35 |
|
|
81
|
BO |
EnCana |
SHB 53-28, 35-28, 36-28 |
completions |
03/23/09 |
Granted |
|
4/1/2008 to 4/05/2009 |
wyw125950 |
|
|
|
|
|
82
|
SG |
EnCana |
Yellow Point 48-13 |
completions |
03/24/09 |
Denied |
4/1/09 to 5/8/09 |
|
WYW 141883 |
28 |
109 |
13 |
|
|
83
|
BO |
EnCana |
SHB 35-34 |
completions |
03/24/09 |
Granted |
4/1/09 to 4/15/09 |
4/01/2009 to 4/15/2009 |
WYW 100902 |
29 |
108 |
34 |
|
|
84
|
SG, BO |
SWEPI LP |
Boulder 14-32 |
install instruments to monitor well head pressure |
03/30/09 |
Granted |
4/8/09 to 4/9/09 |
4/0/2009 to 4/09/2009 |
WYW 144994 |
31 |
108 |
32 |
Per ROD, exceptions granted to sage grouse in DA 4 |
|
85
|
SG |
EnCana |
YellowPoint 52-13,53-13,35-13 |
Drilling, Completion, Production, and Reclamation |
04/06/09 |
Granted |
4/1/09 to 7/16/09 |
4/01/2009 to 7/15/2009 |
WYW-141883 |
28 |
109 |
13 |
|
|
86
|
Raptor |
Ultra |
RS 7B2-2D and RS 2A1-2D |
Workover operations, drill out plugs |
04/01/09 |
Granted |
ASAP to 04/22/09 |
4/09/2009 to 4/27/2009 |
WYW 06270 |
31 |
109 |
2 |
|
|
87
|
Raptor |
Ultra |
RS 5A2-2D, 3D2-2D, 6A2-2D, 5B1-2D, 4C1-2D, 6B2-2D |
Completions and Workover operations |
04/01/09 |
Granted |
4/15/2009 to 7/1/09 |
4/15/2009 to 7/01/2009 |
WYW 06270 |
31 |
109 |
2 |
|
|
88
|
BGCWR,SG |
Anschutz |
Mesa 14-19ad |
hang tubing: run 2-7/8" velocity string to +8,700' |
04/20/09 |
Granted |
04/20/09 to 04/25/09 |
04/20/09 to 04/25/09 |
WYW 135123 |
32 |
109 |
19 |
|
|
89
|
BG, SG |
SWEPI LP |
Mesa 1-27 |
Construction, drilling 7 wells, completions and facility setting |
04/14/09 |
Granted |
4/20/09 to 7/15/09 |
4/20/2009 to 7/15/2009 |
WYW 116265 |
32 |
109 |
27 |
Per ROD, exceptions granted to sage grouse and big game in DA 2 |
|
90
|
Raptor |
Ultra |
RS 7B2-2D and RS 2A1-2D |
Workover operations, drill out plugs |
04/14/09 |
Granted |
4/14/09 to 4/27/09 |
|
WYW 06270 |
31 |
109 |
2 |
Needed a 5 day extension because workover rig not available |
|
91
|
SG, BO |
SWEPI LP |
Boulder 8-32 |
Remove 4 facility tanks and their existing piping. |
04/08/09 |
Canceled |
4/27/2009 to 5/1/09 |
4/27/2009 to 5/01/2009 |
WYW 015316 |
31 |
108 |
32 |
Tanks will be moved to the NP 14-8 for May scheduled drilling in compliance
with the ROD |
|
92
|
SG |
SWEPI LP |
Shell Central LGS |
Install LGS pipelines |
04/07/09 |
Granted |
5/1/2009 to 7/15/09 |
5/01/2009 to 7/15/2009 |
numerous |
31 |
108 &109 |
19, 32 and 13, 23 & 25 |
Per the ROD, LGS installed within 2 years of the signing of the ROD |
|
93
|
SG, BFF |
SWEPI LP |
Shell Central LGS |
Install LGS pipelines |
04/07/09 |
Granted |
5/1/2009 to 7/15/09 |
5/01/2009 to 7/15/2009 |
numerous |
31 |
109 |
24 |
BFF surveys showed no sign, Per the ROD, LGS installed within 2 years
of the signing of the ROD |
|
94
|
SG |
SWEPI LP |
Mesa 5-33 |
Drilling, construction, completion, facilities and pipeline work |
04/15/09 |
Granted |
5/1/09 to 7/15/09 |
5/01/2009 to 7/15/2009 |
WYW 118165 |
32 |
109 |
32 |
Per ROD, exceptions granted to sage grouse and big game in DA 2 |
|
95
|
SG |
SWEPI LP |
Rainbow 13-32 |
Remove 4 facility tanks and their existing piping, prior mistake in
location |
04/23/09 |
Granted |
4/27/09 to 5/1/09 |
4/27/2009 to 5/01/2009 |
WYW 118148 |
30 |
107 |
32 |
Tanks will be moved to the NP 14-8 for May scheduled drilling in compliance
with the ROD |
|
96
|
SG, Raptor, Mtn Plover |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176858 |
31 |
109 |
2, 3, 4 |
|
|
97
|
SG, Raptor, Mtn Plover |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176859 |
32 |
109 |
34 |
|
|
98
|
SG, Raptor |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176865 |
32 |
109 |
27, 34 |
|
|
99
|
SG, Raptor |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176864 |
31 |
109 |
2, 3 |
|
|
100
|
SG, Raptor |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176863 |
32 |
109 |
35 |
|
|
101
|
SG, Raptor, Mtn Plover |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176862 |
32 |
109 |
26, 27, 34 |
|
|
102
|
SG, Raptor |
Ultra |
LGS North |
Installation |
04/28/09 |
Canceled |
ASAP to 11/15/09 |
NA |
WYW176861 |
31 |
109 |
2, 3 |
|
|
103
|
SG, Raptor |
Ultra |
Mesa 1-33, 1B1-33 Simops and 16-28 |
Fencing activities, cattleguard replacement, culver replacement, pit
closure, reclamation, facility removal, pipeline installation, fence removal |
04/30/09 |
Granted |
5/1/09 to 6/30/09 |
5/01/2009 to 6/30/2009 |
WYW 06286 |
32 |
109 |
28, 33 |
BLM required Ultra to remove fencing that is clocking off Lovatt Draw
before cattle turn out |
|
104
|
BO |
EnCana |
Stud Horse Butte 60-27 |
Completion activities |
05/04/09 |
Granted |
5/12/09 to 5/14/09 |
5/12/09 to 5/14/09 |
WYW102899 |
29 |
109 |
27 |
|
|
105
|
SG |
SWEPI LP |
Shell North LGS |
Installation |
05/07/09 |
Granted |
5/11/09 to 7/15/09 |
5/11/2009 to 07/15/2009 |
numerous |
32 |
109 |
2, 26, 27, 28, 29, 32, 33 |
Per the ROD, LGS installed within 2 years of the signing of the ROD |
|
106
|
SG |
SWEPI LP |
Shell Central LGS |
Installation |
05/01/09 |
Granted |
5/11/09 to 7/15/09 |
5/11/2009 to 07/15/2009 |
numerous |
31 |
108&109 |
19, 29, 30, 32 and 13, 14, 24 |
Per the ROD, LGS installed within 2 years of the signing of the ROD |
|
107
|
FH |
SWEPI LP |
Shell North LGS 8-3 |
Installation |
04/29/09 |
Granted |
5/11/09 to 7/31/09 |
5/11/2009 to 07/15/2009 |
numerous |
32 |
109 |
3 |
|
|
108
|
SG |
SWEPI LP |
Riverside 11-13 |
Pit closure |
05/05/09 |
Granted |
5/11/09 to 6/8/09 |
5/11/2009 to 06/08/2009 |
WYW 06269 |
31 |
109 |
13 |
In the Core of the PAPA. Pit liner is no longer intact. Shell will close
pits to meet pit standards. |
|
109
|
SG |
EnCana |
Cabrito 20-30 |
Drilling, Completion, Pipeline and reclamation activities |
05/08/09 |
Denied |
6/10/09 to 7/15/09 |
|
WYW 102717 |
29 |
107 |
30 |
|
|
110
|
SG, BO |
SWEPI LP |
Boulder 14-32 |
Pit closure |
05/08/09 |
Granted |
5/21/09 to 7/15/09 |
5/21/2009 to 7/15/2009 |
WYW 144994 |
31 |
108 |
32 |
In the Core of the PAPA. Shell will close pits to expedite reclamation
of this pad |
|
111
|
FH |
SWEPI LP |
Riverside 8-3 |
North LGS tie in |
04/29/09 |
Granted |
5/11/09 to 7/15/09 |
5/11/2009 to 7/15/2009 |
176844 & 176845 |
32 |
109 |
3 |
Per the ROD, LGS installed within 2 years of the signing of the ROD,
activity shielded by drilling on RS 1-3 |
|
112
|
FH |
Ultra |
Mesa/RS LGS #1 |
trenchers, pick-up trucks, backhoes, trucks with trailers spooling pipe,
trackhoes, dozers, sidebooms, blades |
05/18/09 |
Denied |
05/18/2009 to 06/01/09 |
|
WYW 176867 and WYW 176866 |
31 |
109 |
3 |
BLM believes this to be in line with MBTA regulations. |
|
113
|
SG, Raptor |
Ultra |
Warbonnet 7-4 |
Completions, Workover |
05/08/09 |
|
6/4/2009 to 7/31/2009 |
|
WYW144994 |
31 |
108 |
30 |
Per ROD, DA 3 |
|
114
|
SG |
Ultra |
Boulder 10A-30 |
Completions, Workover |
05/08/09 |
|
6/8/2009 to 7/15/2009 |
|
WYW015316 |
30 |
108 |
4 |
Per ROD, DA 4 |
|
115
|
SG |
Ultra |
Jensen Waterline |
Install 2" polypipe for livestock use this grazing season |
05/08/09 |
|
5/25/2009 to 6/7/2009 |
|
WYW176933 |
31 |
109 |
13 |
Asked for a two week window, but installation will take 3 days once
materials are aquired |
|
116
|
SG, BO |
SWEPI LP |
Riverside 1-23 |
Remove cuttings from the RS 11-13 to the RS 1-23 |
05/22/09 |
|
5/28/09 to 6/26/09 |
|
WYW 026025 |
31 |
109 |
23 |
Fill in pits to speed up reclamation per the ROD. |
|
117
|
SG |
SWEPI LP |
Riverside 11-13 |
Pit closure extension |
05/22/09 |
|
6/9/09 to 6/26/09 |
|
WYW 06269 |
31 |
109 |
13 |
Needed an extension for previous exception |
|
118
|
BO |
EnCana |
SHB 38-34,37-34,39-34,44-34,79-27,69-27,74-27,60-27,27-34,23-34 |
Drilling, completion, production, reclamation |
06/05/09 |
Granted |
6/11/09 to 8/15/09 |
6/11/2009 to 8/15/2009 |
WYW100902,102899 |
29 |
108 |
34,37 |
|
|
119
|
SG |
Questar |
SP 14-20 |
construct pad,dirt work set conductors, drill two delineation wells |
06/03/09 |
Granted |
06/03/09 to 07/15/09 |
06/09/09 to 07/15/2009 |
WYW08693 |
33 |
109 |
20, 29 |
due to economic down turn and release of several rigs questar would
not meet 2 yr delineation window |
|
120
|
SG |
QGM |
Mesa 8-19 loop |
679ft pipeline construction and reclamation 50 ft ROW |
06/06/09 |
Granted |
06/22/09 to 07/03/09 |
06/22/09 to 07/03/09 |
WYW175507 |
32 |
109 |
19 |
there are two pads that are being drilled within the section this activity
would not significantly increase disturbance to sg |
|
121
|
Raptor |
Sublette Comm. |
Mt. Airy |
Replace tower with larger one |
06/11/09 |
|
6/12/09 to 8/1/09 |
|
WYW148061 |
33 |
110 |
12 |
|
|
122
|
Sage Grouse |
EnCana |
Cabrito 20-30 #2 |
Drilling,Completion, Production |
06/12/09 |
Granted |
7/6/09 thru 7/15/09 |
07/06/2009 to 07/15/2009 |
WYW102717 |
29 |
107 |
30 |
|
|
123
|
SG, BO |
SWEPI LP |
Riverside 2-24 |
Install Tubing on 4 wells |
06/09/09 |
Granted |
6/22/09 to 7/24/09 |
06/22/09 to 07/24/09 |
WYW 06269 |
31 |
109 |
24 |
The wells are slugging and causing VOC's to release. This is a maintenance
activity. |
|
124
|
SG, FH |
SWEPI LP |
North LGS and Mesa 13-35 |
Complete 4 wells on the Mesa 13-35 and Construct North LGS |
06/12/09 |
Granted |
6/22/09 to 7/31/09 |
06/22/09 to 07/31/09 |
multiple |
multiple |
multiple |
multiple |
Per the ROD and the status of the ferruginous hawk is inactive as of
6/16/09 |
|
125
|
SG |
SWEPI LP |
Riverside 11-13 & 1-23 |
Extension to previous exception due to weather |
06/18/09 |
Granted |
6/26/09 to 7/15/09 |
06/26/2009 to 07/15/2009 |
WYW 026025 |
31 |
109 |
13 |
Excessive precipitation has prevented SWEPI LP from transfering the
cuttings so additional time is required. |
|
126
|
SG |
Ultra |
Warbonnet CGF 3 |
Construction and Facility Installation for the Liquids Gathering System
Central Gathering Facility 3 |
06/22/09 |
Granted |
6/26/09 to 7/15/19 |
06/26/2009 to 07/15/2009 |
WYW 176868 |
30 |
108 |
4 |
Per the ROD sage grouse exceptions granted per annual planning meeting
schedule in DA 4, LGS installed within 2 years of the signing of the ROD |
|
127
|
SG |
Questar |
Mesa 8-19 Loop |
679ft pipeline construction and reclamation 50 ft ROW |
06/24/09 |
Granted |
07/04/2009 to 07/15/2009 |
07/04/2009 to 07/15/2009 |
WYW 175507 |
32 |
109 |
19 |
Due to weather conditions the action could not be completed at the original
time requested. |
|
128
|
BO, BAEA Winter, BG |
SWEPI LP |
Riverside 11-2 |
Drilling and Completions |
06/22/09 |
Granted |
7/15/09 to 8/2010 |
07/15/2009 to 08/31/2010 |
WYW 06270 |
31 |
109 |
2 |
In compliance with the ROD, 'once on a pad - stay on a pad' drilling
management |
|
129
|
SG, BO |
SWEPI LP |
Riverside 11-25 |
Tubing Installation on 2 wells |
06/23/09 |
Granted |
7/4/09 to 7/30/09 |
7/4/2009 to 7/30/2009 |
WYW 06269 |
31 |
109 |
25 |
Wells are slugging and released uncontrolled emissions. |
|
130
|
Raptor |
Ultra |
Multiple wells/LGS |
Completions/Workover operations and LGS Installation in DA 2 |
06/24/09 |
Granted |
6/15/09 to 7/31 |
07/15/2009 to 7/31/2006 |
Multiple |
Multiple |
Multiple |
Multiple |
Per the ROD (LGS installation) and the inactive status of the ferruginous
hawk as of 6/16/09 |
|
131
|
SG |
Ultra |
Warbonnet LGS #3 |
Construction and Installation for the Liquids Gathering System # 3 |
06/24/09 |
Granted |
6/29 to 7/15 |
6/29/200/ to 7/15/2009 |
Multiple |
Multiple |
Multiple |
Multiple |
Per the ROD, LGS installed within 2 years of the signing of the ROD |
|
132
|
SG, BO |
Ultra |
Warbonnet LGS #3 |
Construction and Installation for the Liquids Gathering System # 3 |
06/24/09 |
Partial |
6/29 to 8/15 |
6/29/2009 to 8/15/2009 |
Multiple |
Multiple |
Multiple |
Multiple |
Per the ROD, LGS installed within 2 years of the signing of the ROD,
only permitted ouside of BO area |
|
133
|
Raptor |
Cimarex |
Riley Ridge #20-14 |
Drilling |
06/30/09 |
Granted |
7/1/09 to 8/1/09 |
07/03/2009 to 08/01/2009 |
WYW60620 |
26 |
114 |
17 |
|
|
134
|
Raptor |
Sublette County |
|
Crushing on Gravel Pit |
06/30/09 |
Partial |
7/1/09 to 8/1/09 |
07/16/2009 to 08/01/2009 |
WYW175548 |
30 |
113 |
28 |
|
|
135
|
BO |
SWEIPLP |
Central LGS pipeline |
construct LGS pipeline |
07/06/09 |
hold |
|
|
|
|
|
|
|
|
136
|
BO, BG,SG,pygmy |
Questar |
Mesa 15-20 |
Construction pad expansion, drilling, completions, production facilities |
07/18/09 |
Granted |
07/18/09-11/15/10 |
07/18/09-11/15/10 |
WYW015315 |
32 |
109 |
20 |
BO surveys were conducted per BLM protocol and no owls were observed.
This location within CDA. |
|
137
|
BO |
Shell |
Riverside 13-4 |
Reclamation, pit closures and recontouring, 5-10 people, scrapers, dozers
and water trucks |
07/24/09 |
Granted |
07/22/09-08/15/09 |
07/24/09-08/15/09 |
WYW118165 |
31 |
109 |
4 |
BO surveys were conducted per BLM protocol and no owls were observed.
This location within CDA. |
|
138
|
BO |
Shell |
Riverside 11-25 |
Pit closure, large heavy equip, pick up trucks, crew 5-10, daylight
hours |
08/07/09 |
Granted |
08/07/09-09/07/09 |
08/07/09-09/07/09 |
WYW 06269 |
31 |
109 |
25 |
BO surveys were conducted per BLM protocol and no owls were observed.
This location within CDA. |
|
139
|
sg |
Shell |
Antelope 1-5 |
construction, drilling, completions, facility maintenance |
11/15/10 |
Granted |
11/15/2010 to 08/2010 |
11/15/2010 to 08/2010 |
WYW 150655 |
29 |
107 |
5 |
Within the core of DA 5 |
|
140
|
BG CWR, SG |
SWEPI LP |
Mesa 5-33 |
construction, drilling, completions, facility maintenance |
08/26/09 |
Granted |
08/26/09 to 11/2010 |
08/26/09 to 11/2010 |
WYW 015314 |
32 |
109 |
33 |
Within the core of DA 2 |
|
141
|
SG, BG CWR |
Questar |
Mesa 6-16 |
Set conductors, move rig, set surface case, drilling and completions |
07/15/09 |
Granted |
07/15/09 to 07/15/2010 |
07/15/09 to 07/15/2010 |
WYW 015317 |
32 |
109 |
16 |
Within the core of DA 2 |
|
142
|
SG, BG CWR, BO |
Questar |
Mesa 15-20 |
Set conductors, move rig, set surface case, drilling and completions |
07/18/10 |
Granted |
07/18/2010 to 11/15/2010 |
07/18/2010 to 11/15/2010 |
WYW 015315 |
32 |
109 |
20 and 29 |
Within the Core of DA 2 |
|
143
|
SG and BG CWR |
Questar |
Mesa 16-19 |
Set conductors, move rig, set surface case, drilling and completions |
08/30/09 |
Granted |
08/30/2009 to 07/15/2010 |
08/30/2009 to 07/15/2010 |
WYW 015315 |
32 |
109 |
19 |
Within the Core of DA 2 |
|
144
|
SG, BG CWR, FH |
SWEPI LP |
Mesa 13-35 |
construction, drilling, completions, facility maintenance |
02/25/10 |
Granted |
02/25/2010 to 08/2010 |
02/25/2010 to 08/2010 |
WYW 015314 |
32 |
109 |
35 |
|
|
145
|
SG, BG CWR, FH |
Questar |
Mesa 3-21 |
Drlling, completions, set facilities, install flow lines, gathering
facilities |
10/28/09 |
Granted |
02/25/2010 to 08/2010 |
02/25/2010 to 08/2010 |
WYW 015317 |
32 |
109 |
21 |
|
|