Number
|
COA |
Company |
Location / Wells |
Requested Action |
Action date |
Action Status |
Requested dates |
Dates excepted |
Lease/ROW |
Town(N) |
Range(W) |
Sec. |
Remarks |
|
1
|
Bald Eagle |
Anschutz |
Riverside 15-6cd |
Complete drilling |
10/11/07 |
Denied |
11/1/07 to 11/30/07 |
N/A |
WYW171983 |
31 |
108 |
7 |
|
|
2
|
Big Game |
Anschutz |
Riverside 15-6cd |
Complete drilling |
10/11/07 |
Denied |
11/15/07 to 11/30/07 |
N/A |
WYW171983 |
31 |
108 |
7 |
|
|
3
|
Bald Eagle |
Ultra |
Riverside 9D-12D |
Drill and Complete |
W/D |
Withdrew |
10/1/07 to 12/1/07 |
N/A |
WYW06270 |
31 |
109 |
12 |
|
|
4
|
Big Game |
Ultra |
Riverside 9D-12D |
Drill and Complete |
W/D |
Withdrew |
10/1/07 to 12/1/07 |
N/A |
WYW06270 |
31 |
109 |
12 |
|
|
5
|
Bald Eagle |
Ultra |
Stewart Point 10D1-8D |
Completion Operations |
10/11/07 |
Denied |
11/1/07 to 11/15/07 |
N/A |
WYW130234 |
33 |
109 |
8 |
|
|
6
|
Bald Eagle |
Ultra |
Stewart Point 10D1-8D |
Completion Operations |
10/31/07 |
Granted |
11/1/07 to 11/15/07 |
11/1/07 to 11/15/07 |
WYW130324 |
33 |
109 |
8 |
FWS & BLM agreed to survey the area, A lot of housing development between
pad & river & riparian area |
|
7
|
Bald Eagle |
Shell |
Riverside 14b-3D,14c-3D,14d-3D,14e-3D |
Completion Operations |
10/31/07 |
Partially Granted |
11/1/07 to 12/1/07 |
11/1/07 to 11/15/07 |
WYW06270 |
31 |
109 |
3 |
Just outside 1 mile for pad, access road within 1 mile, but is already
built |
|
8
|
Big Game |
Shell |
Riverside 14b-3D,14c-3D,14d-3D,14e-3D |
Completion Operations |
10/31/07 |
Denied |
11/1/07 to 12/1/07 |
N/A |
WYW06270 |
31 |
109 |
3 |
|
|
9
|
Bald Eagle |
Questar |
8" Water Loop & Water Loop TUP |
Completion of pipeline |
10/31/07 |
Granted |
11/1/07 to 12/15/07 |
11/1/07 to 12/15/07 |
WYW172255/172256 |
|
|
|
complete instalation within 1 mile of river area first & quickly, following
FWS conservation measures |
|
10
|
Big Game |
Questar |
8" Water Loop & Water Loop TUP |
Completion of pipeline |
10/31/07 |
Granted |
11/1/07 to 12/15/07 |
11/1/07 to 12/15/07 |
WYW172255/172256 |
|
|
|
complete instalation within 1 mile of river area first & quickly, following
FWS conservation measures |
|
11
|
Bald Eagle Winter |
Koch Construction |
James Gravel Pit |
Continue Operations |
11/05/07 |
Granted |
11/1/07 to 11/15/07 |
11/1/07 to 11/15/07 |
WYW172275 |
34 |
111 |
21 |
survey found foraging eagle but habitat was out of line-of-sight of
gravel pit |
|
12
|
Big Game |
Ultra |
Boulder 10C1-31 |
Completion Operations |
11/09/07 |
Granted |
11/15/07 to 11/30/07 |
11/15/07 to 11/30/07 |
WYW144996 |
31 |
108 |
31 |
|
|
13
|
Big Game |
Shell |
Mesa 14c-33D and 14b-33D |
Bring onto production |
11/09/07 |
Granted |
11/15/07 to 11/24/07 |
11/15/07 to 11/24/07 |
WYW118165 |
32 |
109 |
33 |
|
|
14
|
Big Game |
Shell |
Riverside 12b-25D |
Bring onto production |
11/09/07 |
Granted |
11/15/07 to 11/24/07 |
11/15/07 to 11/24/07 |
WYW06269 |
31 |
109 |
25 |
|
|
15
|
Bald Eagle |
Shell |
Riverside 14b-3D,14c-3D,14d-3D,14e-3D |
Completion Operations |
11/09/07 |
Granted |
11/15/07 to 12/01/07 |
11/15/07 to 12/01/07 |
WYW06270 |
31 |
109 |
3 |
|
|
16
|
Big Game |
Shell |
Riverside 14b-3D,14c-3D,14d-3D,14e-3D |
Completion Operations |
11/09/07 |
Granted |
11/15/07 to 12/01/07 |
11/15/07 to 12/01/07 |
WYW06270 |
31 |
109 |
3 |
|
|
17
|
Big Game |
EOG |
Green River Bend Unit 287-20 |
Plugged Well with sand, Work over and then get out. |
11/01/07 |
Granted |
11/15/07 to 11/21/07 |
11/15/07 to 11/21/07 |
WYW020123 |
27 |
112 |
20 |
Cleanout of well is necessary in order to ensure that the well will
produce. |
|
18
|
Big Game |
EOG |
Green River Bend Unit 282-11 |
Finish Completions |
11/13/07 |
Partially Granted |
11/15/07 to 11/30/07 |
11/15/07 to 11/20/07 |
WYW07798E |
26 |
113 |
11 |
Completed drilling on Nov. 12th. Wanted exception for completions through
end of month. |
|
19
|
Big Game |
Shell |
BA5-35 Injection |
Replace Tubing |
11/14/07 |
Granted |
11/15/07 to 11/26/07 |
11/15/07 to 11/26/07 |
WYW-014074 |
29 |
113 |
35 |
|
|
20
|
Big Game |
Exxon Mobil |
Tip Top Unit T44-29G |
Re-Frac formation |
11/15/07 |
Granted |
11/26/07 to 1/23/08 |
11/26/07 to 1/23/08 |
WYE-022234 |
28 |
113 |
29 |
|
|
21
|
Big Game |
Ultra |
Riverside 10C1-25 |
Completion Operations |
11/20/07 |
Denied |
11/29/07 to 12/14/07 |
N/A |
WYW06269 |
31 |
109 |
25 |
Completion operations not started; at a logical stopping point |
|
22
|
Big Game |
Ultra |
Mesa 10b1-27D |
Fix wellbore obstruction, drill out plugs |
11/16/07 |
Granted |
11/15/07 to 11/29/07 |
11/15/07 to 11/29/07 |
WYW06286 |
32 |
109 |
27 |
|
|
23
|
Big Game |
Ultra |
Boulder 9B1-19 |
Completion; drill out plugs, land tubing |
11/16/07 |
Granted |
11/15/07 to 11/18/07 |
11/15/07 to 11/18/07 |
WYW144996 |
31 |
108 |
19 |
|
|
24
|
Big Game |
Ultra |
Riverside 10D-23 |
Workover operations |
11/16/07 |
Granted |
11/15/07 to 11/23/07 |
11/15/07 to 11/23/07 |
WYE-026025 |
31 |
109 |
23 |
|
|
25
|
Big Game |
Ultra |
Riverside 10C1-25 |
fraccing, flowback, drilling out plugs |
11/15/07 |
Granted |
11/15/07 to 11/29/07 |
11/15/07 to 11/29/07 |
WYW 06269 |
31 |
109 |
25 |
|
|
26
|
Big Game |
Ultra |
Riverside 5D-14D |
fish perforating guns out of hole and drill out frac plugs, completions |
11/15/07 |
Granted |
11/15/07 to 11/29/07 |
11/15/07 to 11/29/07 |
WYW 026025 |
31 |
109 |
14 |
Qualified biologist will monitor Bald eagle activity for the duration
of the request |
|
27
|
Bald Eagle |
Ultra |
Riverside 5D-14D |
fish perforating guns out of hole and drill out frac plugs, completions |
11/15/07 |
Granted |
11/15/07 to 11/29/07 |
11/15/07 to 11/29/07 |
WYW 026025 |
31 |
109 |
14 |
Qualified biologist will monitor Bald eagle activity for the duration
of the request |
|
28
|
Big Game |
Questar |
8" Water Loop & Water Loop TUP |
Completion of water pipeline |
11/15/07 |
Granted |
11/15/07 to 11/30/07 |
11/15/07 to 11/30/07 |
WYW 172255/172256 |
|
|
|
long term benefit of installing pipeline will replace truck hauling
of produced water |
|
29
|
Big Game |
Anschutz |
Mesa 14-18bd and Mesa 14-18dd |
Completions operations of 2 wells |
11/15/07 |
Granted |
11/15/07 to 11/30/07 |
11/15/07 to 11/30/07 |
WYW 135123 |
32 |
109 |
19 |
|
|
30
|
Big Game |
Chevron |
Birch Creek Unit 199 |
Lower tubing |
11/19/07 |
Granted |
11/23/07 to 11/25/07 |
11/23/07 to 11/25/07 |
WYE-022247 |
27 |
113 |
9 |
|
|
31
|
Big Game |
Ultra |
Riverside 10D-23 |
oil based mud pit solidification |
11/20/07 |
Partially Granted |
12/1/07 to 12/14/07 |
11/21/07 to 12/07/07 |
WYW 026025 |
31 |
109 |
23 |
|
|
32
|
Big Game |
Ultra |
Boulder 10A-30 |
solidify oil based mud pit |
11/20/07 |
Partially Granted |
12/1/07 to 12/14/07 |
11/21/07 to 12/07/07 |
WYW 144994 |
31 |
108 |
30 |
|
|
33
|
Big Game |
Ultra |
Riverside 9D-12D |
solidify oil based mud pit |
11/20/07 |
Partially Granted |
12/1/07 to 12/14/07 |
11/21/07 to 12/07/07 |
WYW 06270 |
31 |
109 |
12 |
|
|
34
|
Bald Eagle |
Ultra |
Riverside 9D-12D |
solidify oil based mud pit |
11/20/07 |
Partially Granted |
12/1/07 to 12/14/07 |
11/21/07 to 12/07/07 |
WYW 06270 |
31 |
109 |
12 |
|
|
35
|
Big game |
Chevron |
LaBarge K734 |
Plug and abandon well |
12/04/07 |
Granted |
12/17/07 to 12/21/07 |
12/17/07 to 12/21/2007 |
WYE-07675A |
27 |
113 |
34 |
|
|
36
|
Big game |
WWC |
Throughout Mesa by Wyoming Wildlife Consultants |
Sage grouse winter use research |
12/04/07 |
Granted |
12/4/07 to 4/30/08 |
12/4/07 to 4/30/08 |
NA |
|
|
|
|
|
37
|
Sage Grouse Winter |
WWC |
Throughout Mesa by Wyoming Wildlife Consultants |
Sage grouse winter use research |
12/04/07 |
Granted |
12/4/07 to 4/30/08 |
12/4/07 to 4/30/08 |
NA |
|
|
|
|
|
38
|
Big Game |
Ultra |
Mesa 10b1-27D |
Extension to Fix wellbore obstruction, drill out plugs |
12/04/07 |
Granted |
12/4/07 to 12/18/07 |
12/04/07 to 12/18/2007 |
WYW06286 |
32 |
109 |
27 |
|
|
39
|
Big Game |
Ultra |
Riverside 10D-23 |
Extension-Fish the mill; finish workover operations |
12/04/07 |
Granted |
11/21/07 to 4/30/08 |
11/21/07 to 04/30/08 |
WYE026025 |
31 |
109 |
23 |
BLM requested they get to a stopping point as soon as possible |
|
40
|
Big Game |
Ultra |
Mesa 10D-33 (deep well) |
Fishing operations & drill to TD |
12/06/07 |
Granted |
11/14/07 to when TD reached |
11/14/07 to 3/15/08 |
WYW06286 |
32 |
109 |
33 |
|
|
41
|
Big Game |
Shell |
BA5-35 Injection |
Set the packer an additional 20,000# tension |
12/10/2007 |
Granted |
12/17/07 to 12/19/07 |
12/17/07 to 12/19/2007 |
|
|
|
|
|
|
42
|
Big Game |
Wy Wildlife Consult |
Mesa |
|
12/4/2007 |
Granted |
12/04/2007 to 4/30/08 |
12/04/07 to 4/30/08 |
|
|
|
|
|
|
43
|
Sage Grouse Winter |
Ultra |
Water Disposal Well @ Warbonnet 15-26 |
Drill and Complete |
12/21/2007 |
Granted |
12/20/07 to 3/11/08 |
12/21/07 to 03/11/2008 |
ROW# WYW171766 |
30 |
108 |
26 |
Survey by Aster Canyon on 12/17/07 -- no birds or their sign found |
|
44
|
Sage Grouse Nesting |
Ultra |
Warbonnett 7-3 Simops Pad |
Drilling, completion, workover, production operations |
12/21/07 |
Denied |
02/01/08 to 07/31/08 |
N/A |
WYW-016162 |
30 |
108 |
3 |
|
|
45
|
Raptor |
Ultra |
Warbonnett 7-3 Simops Pad |
Drilling, completion, workover, production operations |
12/21/07 |
Partially Granted |
02/01/08 to 07/31/08 |
02/01/08 to 03/01/08 |
WYW-016162 |
30 |
108 |
3 |
|
|
46
|
Sage Grouse Nesting |
Ultra |
Warbonnett 6-4 Simops Pad |
Drilling, completion, workover, production operations |
12/21/07 |
Denied |
02/01/08 to 07/31/08 |
N/A |
WYW-015316 |
30 |
108 |
4 |
|
|
47
|
Raptor |
Ultra |
Warbonnett 6-4 Simops Pad |
Drilling, completion, workover, production operations |
12/21/07 |
Partially Granted |
02/01/08 to 07/31/08 |
02/01/08 to 03/01/08 |
WYW-015316 |
30 |
108 |
4 |
|
|
48
|
Sage Grouse Nesting |
Ultra |
Boulder 12-33 pad |
Drilling, completion, workover, production operations |
12/21/07 |
Denied |
02/01/07 to 01/26/09 |
N/A |
WYW-015316 |
31 |
108 |
33 |
|
|
49
|
Raptor |
Ultra |
Boulder 12-33 pad |
Drilling, completion, workover, production operations |
12/21/07 |
Denied |
02/01/07 to 01/26/09 |
N/A |
WYW-015316 |
31 |
108 |
33 |
|
|
50
|
Burrowing Owl |
Ultra |
Boulder 12-33 pad |
Drilling, completion, workover, production operations |
12/21/07 |
Denied |
02/01/07 to 01/26/09 |
N/A |
WYW-015316 |
31 |
108 |
33 |
|
|
51
|
Raptor |
Ultra |
Warbonnett 15A1-3 |
Completion and production operations |
01/09/08 |
Granted |
02/01/08 to 03/01/08 |
2/1/08 to 3/01/08 |
WYW-018039 |
30 |
108 |
3 |
|
|
52
|
Sage Grouse Nesting |
Newfield |
Antelope 6-5D, 37-5D and 42-5D |
Drilling and construction activities |
01/10/08 |
Denied |
04/15/08 to 08/29/08 |
N/A |
WYW-133051 |
29 |
107 |
5 |
|
|
53
|
Sage Grouse Nesting |
Newfield |
Rainbow 49-31D and 65-31D |
Drilling |
01/10/08 |
Denied |
03/15/08 to 04/15/08 |
N/A |
WYW-118148 |
30 |
107 |
31 |
|
|
54
|
Big Game Crucial |
Anschutz |
Two Buttes 16015cd |
install plunger lift |
01/11/08 |
Granted |
01/12/08 to 01/13/08 |
01/12/08 to 01/13/08 |
WYW 163106X |
32 |
109 |
15 |
this work will only take one day, and will be completed during daylight
hours only |
|
55
|
Raptor |
Ultra |
Warbonnet 9C1-8 |
solidify oil based mud pit |
01/30/08 |
Granted |
02/04/08 to 03/01/08 |
2/04/08 to 03/14/08 |
WYW015314 |
30 |
108 |
8 |
No current or historic raptor nests ?1/2 mile; all ferruginous hawk
nests ? 1 mile = unoccupied |
|
56
|
Raptor |
JGG |
Yellowpoint 2-1 |
Install natural gas pipeline |
02/08/08 |
Granted |
02/01/08 to 05/15/08 |
02/01/08 to 07/31/08 |
WYW153951 |
28 |
109 |
1 |
|
|
57
|
Raptor |
JGG |
Jonah Federal 5-6 |
Install natural gas pipeline |
02/08/08 |
Partially Granted |
02/01/08 to 05/15/08 |
02/01/08 to 04/01/08 |
WYW146067 |
28 |
108 |
6 |
if work extends after 04/01/08 survey for burrowing owls and request
for extention will be needed |
|
58
|
Burrowing Owl |
JGG |
Jonah Federal 5-6 |
Install natural gas pipeline |
02/08/08 |
Partially Granted |
02/01/08 to 05/15/08 |
02/01/08 to 04/01/08 |
WYW146067 |
28 |
108 |
6 |
|
|
59
|
Sage Grouse Nesting |
JGG |
Jonah Federal 5-6 |
Install natural gas pipeline |
02/08/08 |
Partially Granted |
02/01/08 to 05/15/08 |
02/01/08 to 04/01/08 |
WYW146067 |
28 |
108 |
6 |
|
|
60
|
Big game |
WWC |
Throughout Mesa by Wyoming Wildlife Consultants |
Repair equipment for research project |
02/14/08 |
Granted |
2/14/08 to 2/26/08 |
2/14/08 to 2/16/08 |
N/A |
|
|
|
|
|
61
|
Sage Grouse Winter |
WWC |
Throughout Mesa by Wyoming Wildlife Consultants |
Repair equipment for research project |
02/14/08 |
Granted |
2/14/08 to 2/26/08 |
2/14/08 to 2/16/08 |
N/A |
|
|
|
|
|
62
|
Block Clearance |
Jonah Operators |
Surveyed areas of the Jonah Infill with no wildlife concerns |
Block Clearance |
02/25/08 |
Granted |
3/1/-08 to 8/15/08 |
3/01/08 to 8/15/08 |
N/A |
|
|
|
Sections or part of sections that have been surveyed in 2008 and no
wildlife concerns were observed. |
|
63
|
Raptor |
Ultra |
Warbonnett15A1-3 |
Remove tubing & drill; reinstall tubing |
02/29/08 |
Granted |
2/29/08 to 3/7/08 |
2/29/08 to 3/7/08 |
WYW018039 |
30 |
108 |
3 |
All raptor nest unoccupied or inactive in '07 & '06 |
|
64
|
SG nesting |
BP |
SHB 25-22 Pad |
Complete drilling |
03/05/08 |
Granted |
3/15/08-4/23/08 |
3/15/08 to 4/23/08 |
WYW127749 |
29 |
108 |
22 |
Includes the SHB 21-22, 23-22, 26-22, 28-22, 40-22, and 41-22 |
|
65
|
Burrowing Owl |
BP |
SHB 25-22 Pad |
Complete drilling |
03/05/08 |
Partically Granted |
3/15/08-4/23/08 |
04/01/08 to 4/23/08 |
WYW127749 |
29 |
108 |
22 |
Includes the SHB 21-22, 23-22, 26-22, 28-22, 40-22, and 41-23 |
|
66
|
Sage Grouse |
Newfield |
Antelope 6-5D, 37-5D and 42-5D |
Pad expansion |
03/09/08 |
Denied |
04/15/08 to 08/24/08 |
N/A |
WYW133051 |
29 |
107 |
5 |
|
|
67
|
Sage Grouse |
Newfield |
Rainbow 49-31D and 65-31D |
Drilling |
03/09/08 |
Denied |
3/15/08 to 5/15/08 |
N/A |
WYW118148 |
30 |
107 |
31 |
|
|
68
|
Big Game |
Ultra |
Lizard Head 11-8WDW |
Pull tubing, set injection facilities |
03/09/08 |
Denied |
3/11/08 to 4/15/08 |
N/A |
WYW172026 |
31 |
108 |
8 |
|
|
69
|
Bald Eagle |
Ultra |
Lizard Head 11-8WDW |
Pull tubing, set injection facilities |
03/09/08 |
Denied |
3/11/08 to 4/15/08 |
N/A |
WYW172026 |
31 |
108 |
8 |
|
|
70
|
Sage Grouse Nesting |
Encana |
Jonah Federal 13-18 and 14-18 |
Completion Operations |
03/10/08 |
Granted |
03/10/08 to 03/25/08 |
3/10/08 to 3/25/08 |
WYW-141883 |
28 |
108 |
18 |
Yellowpoint Ridge South lek approx. 1 mile south, not active since 2004,
road built through lek |
|
71
|
Sage Grouse Nesting |
Encana |
Yellowpoint 38-13, 45-13, and 51-13 |
construction, drilling, completion, pipeline, reclamation |
03/11/08 |
Granted |
03/15/08 to 07/15/08 |
3/15/08 to 7/15/08 |
WYW-141883 |
28 |
108 |
13 |
Yellowpoint Ridge South lek approx. 1.5 miles southeast, not active
since 2004, road built through lek |
|
72
|
Sage Grouse Nesting |
Ultra |
Warbonnet 6a1-3D,8D1-, 8c1-, 3d1-, 2b1-, 7a1-3D |
Drilling and completion |
03/11/08 |
Denied |
3/11/2008 to 7/31/08 |
N/A |
WYW016162 |
30 |
108 |
3 |
|
|
73
|
Raptor |
Ultra |
Warbonnet 6a1-3D,8D1-, 8c1-, 3d1-, 2b1-, 7a1-3D |
Drilling and completion |
03/11/08 |
Denied |
3/11/2008 to 7/31/08 |
N/A |
WYW016162 |
30 |
108 |
3 |
|
|
74
|
Raptor |
Ultra |
Warbonnet 5b1-4D,4c1-, 3a1-, 3b1-, 4d1-4D |
Drilling and completion |
03/12/08 |
Denied |
3/11/2008 to 7/31/08 |
N/A |
WYW015316 |
30 |
108 |
4 |
|
|
75
|
Sage Grouse Nesting |
Ultra |
Mesa 10D-33 (deep well) |
Rig moving operations |
03/12/08 |
Granted |
3/15/08 to 3/31/08 |
3/15/2008 to 3/31/2008 |
WYW06286 |
32 |
109 |
33 |
Ultra to remove rig from site |
|
76
|
Sage Grouse Nesting |
Shell |
Boulder 13c-32D |
Rig down and move off location |
03/13/08 |
Granted |
3/15/08 to 03/18/08 |
3/15/2008 to 3/18/2008 |
WYW144994 |
31 |
108 |
32 |
Shell to rig down and move off the Boulder 13d-32d location |
|
77
|
Sage Grouse Nesting |
Shell |
Warbonnet 11b-14D and 12b-14D |
Monitor flowback operations |
03/13/08 |
Granted |
3/15/08 to 03/20/08 |
3/15/08 to 3/20/08 |
WYW015314 |
30 |
108 |
14 |
Shell to monitor flowback at warbonnet 11b 12b-14d locations |
|
78
|
Big Game |
QGM |
Stewart Point (Sec. 17, 16) and Mesa pipelines (Sec. 20,21,28) |
Survey and stake pipeline placement |
03/13/08 |
Denied |
3/12/2008 to 3/26/08 |
N/A |
|
32/33 |
109 |
|
|
|
79
|
Sage Grouse |
QGM |
Stewart Point (Sec. 17, 16) and Mesa pipelines (Sec. 20,21,28) |
Survey and stake pipeline placement |
03/13/08 |
Denied |
3/12/2008 to 3/26/08 |
N/A |
|
32/33 |
109 |
|
|
|
80
|
Sage Grouse Nesting |
Encana |
Jonah Federal 3-18, 5-18, 6-18 and 7-18 |
construction, drilling, completion, pipeline, reclamation |
03/14/08 |
Partially Granted |
3/10/08 to 07/15/08 |
3/10/08 to 07/15/08 |
WYW141883 |
28 |
108 |
18 |
|
|
81
|
Sage Grouse Nesting |
Encana |
Yellowpoint 9-13 and 16-13 |
construction, drilling, completion, pipeline, reclamation |
03/14/08 |
Denied |
3/15/08 to 07/15/08 |
N/A |
WYW141883 |
28 |
109 |
13 |
|
|
82
|
Sage Grouse Nesting |
JGG |
Cabrito 9-25 |
Construction of pipeline |
03/06/08 |
Granted |
3/15/08 to 07/15/08 |
3/15/08 to 07/ 15/08 |
WYW172196 |
29 |
108 |
25 |
To install natural gas pipeline |
|
83
|
Burrowing Owl |
Encana |
Jonah Federal 40-5 |
Finish Completions |
03/18/08 |
Granted |
3/18/08 to 4/15/2008 |
3/18/2008 to 4/15/2008 |
WYW125943 |
28 |
108 |
5 |
To complete fracing activities |
|
84
|
Burrowing Owl |
EnCana |
Yellowpoint 35-1 |
Begin Drilling and Completions |
03/11/08 |
Granted |
4/1/2008 to 8/15/2008 |
04/01/2008 to 07/15/2008 |
WYW141882 |
28 |
109 |
1 |
|
|
85
|
Burrowing Owl |
EnCana |
Stud Horse Butte 71, 73, and 76-27 |
Finish Completions |
03/20/08 |
Granted |
4/1/2008 to 4/15/2008 |
03/26/08 to 4/20/08 |
WYW102899 |
29 |
108 |
27 |
|
|
86
|
Burrowing Owl |
EnCana |
SHB 37-6 |
Finish Drilling and Completions |
03/15/08 |
Granted |
4/1/2008 to 8/15/2008 |
04/01/08 to 7/15/08 |
WYW125943 |
28 |
108 |
6 |
|
|
87
|
Burrowing Owl |
Encana |
SHB 37-26 |
Finish Drilling and Completions |
03/15/08 |
Granted |
4/1/2008 to 4/15/2008 |
04/01/08 to 07/15/08 |
WYW127749 |
29 |
108 |
26 |
|
|
88
|
Sage Grouse Nesting |
Encana |
Stud horse Butte 35-15 |
Finish Completion Activities |
03/14/08 |
Denied |
3/10/2008 to 4/1/2008 |
N/A |
WYW127749 |
29 |
108 |
15 |
|
|
89
|
Sage Grouse nesting |
Encana |
Stud Horse Butte 59-22 |
Finish Completion Activities |
03/14/08 |
Granted |
03/10/08 to 4/1/2008 |
03/10/08 to 04/01/08 |
WYW127749 |
29 |
108 |
22 |
Verbally granted on 3/14/2008 |
|
90
|
Big Game |
QGM |
Stewart Point (Sec. 17, 16) and Mesa pipelines (Sec. 20,21,28) |
Survey and stake pipeline placement |
03/25/08 |
Granted |
3/18/08 to 3/19/08 |
3/27/08-3/28/08 |
|
32/33 |
109 |
|
This action considered casual use by BLM |
|
91
|
Sage Grouse Nesting |
Ultra |
Boulder 10C1-33 |
solidify oil based mud pit |
03/03/08 |
Granted |
3/24/08 to 3/28/08 |
3/24/08 to 3/28/08 |
WYW118159 |
31 |
108 |
33 |
Verbally grannted on 3/20/08 |
|
92
|
Sage Grouse Nesting |
Shell |
Boulder 12c-32D, 14a-32D,13b-32D,13c-32D |
Completion Activities |
03/27/08 |
Denied |
4/1/08 to 7/15/08 |
N/A |
WYW144994 |
31 |
108 |
32 |
|
|
93
|
Burrowing Owl |
Shell |
Boulder 12c-32D, 14a-32D,13b-32D,13c-32D |
Completion Activities |
03/27/08 |
Denied |
4/1/08 to 7/15/08 |
N/A |
WYW144994 |
31 |
108 |
32 |
|
|
94
|
Raptor |
Vector |
Isenhour 1-17, 5-17, 11-17, 13-17, and 15-17 |
tank battery installation and electric power |
03/29/08 |
Partially Granted |
03/17/08 to 04/11/08 |
03/24/08 to 04/26/08 |
WYW 160129 |
29 |
112 |
17 |
partially granted due to distance some of the wells are from the raptor
nests. The locations farther than 1/2 mile were granted. |
|
95
|
Sage Grouse Nesting |
Newfield |
Rainbow 9-30DX, 51-30D, 67-30D |
Flowback and well cleanup |
03/13/08 |
Granted |
3/15/08 to 3/28/08 |
3/15/08 to 3/28/08 |
WYW118148 |
30 |
107 |
30 |
|
|
96
|
Burrowing Owl |
Encana |
Jonah Federal 25-6 |
Finish completions |
04/10/08 |
Denied |
04/08/08 to 07/16/08 |
N/A |
WYW125943 |
28 |
108 |
6 |
Nest is less than 500 feet from location, in line of site |
|
97
|
Burrowing Owl |
Encana |
SHB 29-6 |
Finish completions |
04/09/08 |
Withdrew |
04/08/08 to 07/15/08 |
N/A |
WYW125943 |
28 |
108 |
6 |
|
|
98
|
Sage Grouse |
Exxon Mobil |
Hogsback Unit T88X-6G |
Construct flare pit and conduct well work |
04/18/08 |
Denied |
5/1/08 to ??? |
N/A |
WYW80929 |
26 |
113 |
6 |
|
|
99
|
Sage Grouse Nesting |
Encana |
Yellowpoint 9-13 and 16-13 |
construction, drilling, completion, pipeline, reclamation |
04/16/08 |
Granted |
4/15/08 to 07/15/08 |
4/15/08 to 7/15/08 |
WYW141883 |
28 |
109 |
13 |
sage grouse lek surveys done in the Yellowpoint Ridge South area, no
birds observed |
|
100
|
Big Game |
Questar |
Stewart Point 10-18; 1D3-18, 9A3-18 |
Construction |
04/16/08 |
Denied |
4/15/08 to 4/29/08 |
N/A |
WYW08593 |
33 |
109 |
18 |
Survey 4/15/08 found mule deer still migrating thru area |
|
101
|
Big Game |
Questar |
Stewart Point 5-20; 4B4-20;4C4-, 4D4-, 5A3-, 5B3-, 5B4-20 |
Construction |
04/16/08 |
Denied |
4/15/08 to 4/29/08 |
N/A |
WYW08593 |
33 |
109 |
20 |
Survey 4/15/08 found mule deer still migrating thru area |
|
102
|
Sage Grouse |
Anschutz |
Mesa 3-19, 14-18dd |
Run production log |
04/23/08 |
Granted |
5/1/2008 |
1 day by 4/25/08 |
WYW135123 |
32 |
109 |
19 |
activity can be done in one day during daylight hours |
|
103
|
Big game |
Anschutz |
Mesa 3-19, 14-18dd |
Run production log |
04/23/08 |
Granted |
5/1/2008 |
1 day by 4/25/08 |
WYW135123 |
32 |
109 |
19 |
activity can be done in one day during daylight hours |
|
104
|
Raptor |
Shell |
Mesa 12b-34D,14b-34D,13c-34D,13d-34D |
Build, drill, complete |
04/25/08 |
denied |
5/1/08 to 7/31/08 |
N/A |
WYW06286 |
32 |
109 |
34 |
FH77 & territory active as of 4/22/08 by TRC |
|
105
|
Burrowing Owl |
Shell |
Mesa 12b-34D,14b-34D,13c-34D,13d-34D |
Build, drill, complete |
04/25/08 |
denied |
5/1/08 to 7/31/08 |
N/A |
WYW06286 |
32 |
109 |
34 |
|
|
106
|
Mountain Plover |
Shell |
Mesa 12b-34D,14b-34D,13c-34D,13d-34D |
Build, drill, complete |
04/25/08 |
denied |
5/1/08 to 7/31/08 |
N/A |
WYW06286 |
32 |
109 |
34 |
|
|
107
|
Raptor |
Shell |
Mesa 11c-35D,12b-35D,11d-35D,12c-35D,12d-35D |
Build, drill, complete |
04/25/08 |
denied |
5/1/08 to 8/15/08 |
N/A |
WYW06286 |
32 |
109 |
35 |
|
|
108
|
Burrowing Owl |
Shell |
Mesa 11c-35D,12b-35D,11d-35D,12c-35D,12d-35D |
Build, drill, complete |
04/25/08 |
denied |
5/1/08 to 8/15/08 |
N/A |
WYW06286 |
32 |
109 |
35 |
|
|
109
|
Sage Grouse |
Shell |
Mesa 11c-35D,12b-35D,11d-35D,12c-35D,12d-35D |
Build, drill, complete |
04/25/08 |
denied |
5/1/08 to 8/15/08 |
N/A |
WYW06286 |
32 |
109 |
35 |
|
|
110
|
Sage Grouse |
Shell |
Mesa 1-29 pad; 3c-28D,3d-28D,3b-28DX,1d-29D,8c-29D |
Completion Activities |
04/25/08 |
denied |
5/1/08 to 7/15/08 |
N/A |
WYW118165 |
32 |
109 |
28 |
|
|
111
|
Sage Grouse |
Shell |
Mesa 12-33pad; 13d-, 12c-, 12b-, 11c-, 11b-, 14d-, 11d-, 12d-33D |
Drill conductors and completion activities |
04/25/08 |
Denied |
5/2/08 to 7/15/08 |
N/A |
WYW118165 |
32 |
109 |
33 |
|
|
112
|
Burrowing Owl |
Shell |
Mesa 12-33pad; 13d-, 12c-, 12b-, 11c-, 11b-, 14d-, 11d-, 12d-33D |
Drill conductors and completion activities |
04/25/08 |
Denied |
5/2/08 to 7/15/08 |
N/A |
WYW118165 |
32 |
109 |
33 |
|
|
113
|
Sage Grouse |
Shell |
Mesa 5-26 pad; 7d-27D,2a-27DX,7b-27DX,7e-27D, 1b-27D |
Drill and Complete |
04/28/08 |
Granted |
5/1/08 to 7/15/08 |
5/1/08 to 7/15/08 |
WYW116265 |
32 |
109 |
26 |
|
|
114
|
Sage Grouse |
Shriver Gravel Pit |
Shriver Sand and Gravel Sec.20, T34N, R109W |
Mine, crush, and haul gravel |
04/28/08 |
Granted |
4/28/08 to 12/31/08 |
4/29/08 to 12/31/08 |
N/A |
34 |
109 |
20 |
Survey by Aster Canyon on 04/15/08 -- birds found/ no nests (will avoid) |
|
115
|
Migratory Birds |
Shriver Gravel Pit |
Shriver Sand and Gravel Sec.20, T34N, R109W |
Mine, crush, and haul gravel |
04/28/08 |
Granted |
4/28/08 to 12/31/08 |
4/29/08 to 12/31/08 |
N/A |
34 |
109 |
20 |
Survey by Aster Canyon on 04/16/08 -- birds found (will avoid) |
|
116
|
Raptor |
Shriver Gravel Pit |
Shriver Sand and Gravel Sec.20, T34N, R109W |
Mine, crush, and haul gravel |
04/28/08 |
Granted |
4/28/08 to 12/31/08 |
4/29/08 to 12/31/08 |
N/A |
34 |
109 |
20 |
Survey by Aster Canyon on 04/16/08 -- no nests |
|
117
|
Burrowing Owl |
Shriver Gravel Pit |
Shriver Sand and Gravel Sec.20, T34N, R109W |
Mine, crush, and haul gravel |
04/28/08 |
Granted |
4/28/08 to 12/31/08 |
4/29/08 to 12/31/08 |
N/A |
34 |
109 |
20 |
Prairie dog survey by Kail Consulting on 10/17/07 -- no prairie dogs
or burrowing owls seen |
|
118
|
Pygmy Rabbit |
Shriver Gravel Pit |
Shriver Sand and Gravel Sec.20, T34N, R109W |
Mine, crush, and haul gravel |
04/28/08 |
Granted |
4/28/08 to 12/31/08 |
4/29/08 to 12/31/08 |
N/A |
34 |
109 |
20 |
Survey by WY Wildlife Consultants on 03/27/07 -- no rabbits or sign
seen |
|
119
|
Sage Grouse |
Ultra |
Mesa 10D-33 (deep well) |
Completion Activities |
05/02/08 |
Granted |
5/1/08 to 7/15/08 |
5/2/08 to 7/15/08 |
WYW06286 |
32 |
109 |
33 |
|
|
120
|
Burrowing Owl |
Ultra |
Mesa 10D-33 (deep well) |
Completion Activities |
05/02/08 |
Granted |
5/1/08 to 7/15/08 |
5/2/08 to 7/15/08 |
WYW06286 |
32 |
109 |
33 |
|
|
121
|
Sage Grouse |
Ultra |
Warbonnet 7-3 pad; 8D1-3D,8C1-, 3D1-, 2B1-, 7A1-, 6A1-3D |
Drill and Complete |
05/02/08 |
Denied |
5/1/08 to 7/31/08 |
N/A |
WYW016162 |
30 |
108 |
3 |
|
|
122
|
Raptor |
Ultra |
Warbonnet 7-3 pad; 8D1-3D,8C1-, 3D1-, 2B1-, 7A1-, 6A1-3D |
Drill and Complete |
05/02/08 |
Denied |
5/1/08 to 7/31/08 |
N/A |
WYW016162 |
30 |
108 |
3 |
|
|
123
|
Sage Grouse |
Ultra |
Mesa 9-28 pad; 9C1-28D |
Drill and Complete |
|
|
5/1/08 to 7/15/08 |
|
WYW06286 |
32 |
109 |
28 |
|
|
124
|
Raptor |
Ultra |
Mesa 9-28 pad; 9C1-28D |
Drill and Complete |
|
|
5/1/08 to 7/15/08 |
|
WYW06286 |
32 |
109 |
28 |
|
|
125
|
Burrowing Owl |
Ultra |
Mesa 9-28 pad; 9C1-28D |
Drill and Complete |
|
|
5/1/08 to 7/15/08 |
|
WYW06286 |
32 |
109 |
28 |
|
|
126
|
Sage Grouse Nesting |
Anschutz |
Mesa 14-19 pad |
Drilling operations |
05/02/08 |
Denied |
05/01/08 to ?? |
|
WYW135123 |
19 |
109 |
32 |
Three active sage grouse leks |
|
127
|
Sage Grouse Nesting |
Shell |
Boulder 1a-32D, 1b-32D, 8b-32D, 7b-32D |
Completion Activities |
05/05/08 |
Denied |
asap -- 5-7 weeks |
|
WYW015316 |
31 |
108 |
32 |
Big Fred and Little Fred Lek and burrowing owl nesting |
|
128
|
Burrowing Owl |
Shell |
Boulder 1a-32D, 1b-32D, 8b-32D, 7b-32D |
Completion Activities |
05/05/08 |
Denied |
asap -- 5-7 weeks |
|
WYW015316 |
31 |
108 |
32 |
Survey 5/3/08 found 2 burrowing owl nests associated with pairie dog
towns <1/2 mile |
|
129
|
Raptor |
Shell |
Boulder 1a-32D, 1b-32D, 8b-32D, 7b-32D |
Completion Activities |
05/05/08 |
Denied |
asap -- 5-7 weeks |
|
WYW015316 |
31 |
108 |
32 |
|
|
130
|
Sage Grouse Nesting |
Shell |
Mesa 14b-28D, 14c-28D, 11b-28D, 12b-28D |
Construct, Drill, Complete |
05/05/08 |
Denied |
5/1/08 to 7/15/08 |
|
WYW118165 |
32 |
109 |
28 |
|
|
131
|
Sage Grouse Nesting |
Ultra |
Boulder 15B1-34 |
solidify oil based mud pit |
05/05/08 |
Denied |
5/1/08 to 5/8/08 |
N/A |
WYW118159 |
31 |
108 |
34 |
Little fred sage grouse lek and raptor nesting habitat |
|
132
|
Raptor |
Ultra |
Boulder 15B1-34 |
solidify oil based mud pit |
05/05/08 |
Denied |
5/1/08 to 5/8/08 |
N/A |
WYW118159 |
31 |
108 |
34 |
Survey by TRC -- FH50 active 2008 |
|
133
|
Mountain Plover |
Ultra |
Boulder 15B1-34 |
solidify oil based mud pit |
05/05/08 |
Denied |
5/1/08 to 5/8/08 |
N/A |
WYW118159 |
31 |
108 |
34 |
Needs survey |
|
134
|
Sage Grouse Nesting |
Shell |
Mesa 5-33 pad; 3a-33d, 3b-33D, 6b-33D |
Construct, Drill, Complete |
05/05/08 |
Denied |
5/2/08 to 7/15/08 |
Na |
WYW118165 |
32 |
109 |
33 |
|
|
135
|
Burrowing Owl |
Ultra |
Warbonnet 3A1-5D |
Drill and Complete |
|
|
5/5/08 to 7/31/08 |
|
WYW144994 |
30 |
108 |
5 |
WWC did survey 5/3/08 -- nest found |
|
136
|
Sage Grouse |
Encana |
Worker Camp (old Jonah Federal 4-8) |
Building completion activities |
04/16/08 |
Granted |
3/15/08 to 7/15/08 |
4/16/08 to 7/15/08 |
WYW175327 |
28 |
108 |
8 |
Aster Canyon surveyed for leks 2008 -- 3 mile buffer -- no leks found
& no nest found in 2007 |
|
137
|
Burrowing Owl |
Shell |
Riverside 12b-2D,12c-2D,13b-2D,13c-2D,13d-2D,14b-2D |
Construct, Drill, Complete |
05/05/08 |
Granted |
5/2/08 to 8/15/08 |
5/5/08 to 8/15/08 |
WYW06270 |
31 |
109 |
2 |
WWC did survey 5/3/08 -- no burrowing owls or sign seen |
|
138
|
Sage Grouse Nesting |
Questar |
Stewart Point 7-20 pad; 8C3-20,8C4-20,8D3-20,7D3-20 |
Drill and Complete |
04/28/08 |
Granted |
5/1/08 to 7/15/08 |
5/1/08 to 7/15/08 |
WYW08593 |
33 |
109 |
20 |
Mountain Airy Fence lek (<2mile of pad) not active 2008 by WGFD |
|
139
|
Big Game |
Questar |
Stewart Point 10-18 pad; 1D3-18, 9A3-18 |
Drill and Complete |
04/28/08 |
Granted |
4/23/08 to 7/31/08 |
4/28/08 to 7/31/08 |
WYW08593 |
33 |
109 |
18 |
Surveyed for mule deer; no mule deer within 1 mile of pad site on 4/26/08 |
|
140
|
Big Game |
Questar |
Stewart Point 5-20 pad; 4B4-20,4C4-20,4D3-20,5A3-20,5B4-20 |
Construct, Drill, Complete |
04/28/08 |
Granted |
4/23/08 to 4/30/08 |
4/28/08 to 4/30/08 |
WYW08593 |
33 |
109 |
20 |
Surveyed for mule deer; no mule deer within 1 mile of pad site on 4/26/08 |
|
141
|
Sage Grouse Nesting |
Questar |
Stewart Point 5-20 pad; 4B4-20,4C4-20,4D3-20,5A3-20,5B4-20 |
Construct, Drill, Complete |
04/28/08 |
Granted |
4/23/08 to 7/31/08 |
4/28/08 to 7/31/08 |
WYW08593 |
33 |
109 |
20 |
Mountain Airy Fence lek (<2mile of pad) not active 2008 by WGFD |
|
142
|
Big Game |
Questar |
Stewart Point 5-17 pad; 6A3-17, 6D3-17 |
Construct |
04/28/08 |
Granted |
4/25/08 to 4/30/08 |
4/28/08 to 4/30/08 |
WYW08593 |
33 |
109 |
17 |
Surveyed for mule deer; no mule deer within 1 mile of pad site on 4/26/08 |
|
143
|
Sage Grouse |
Shell |
Boulder 12c-32D,14a-, 13b-, 13c-, 11c-, 14d-, 13e-, 12d-, 14c-, 13d-32D |
Drill and Complete |
04/30/08 |
Granted |
5/1/08 to 7/15/08 |
5/1/08 to 7/15/08 |
WYW144994 |
31 |
108 |
32 |
|
|
144
|
Burrowing Owl |
Shell |
Boulder 12c-32D,14a-, 13b-, 13c-, 11c-, 14d-, 13e-, 12d-, 14c-, 13d-32D |
Drill and Complete |
04/30/08 |
Granted |
5/1/08 to 7/15/08 |
5/1/08 to 7/15/08 |
WYW144994 |
31 |
108 |
32 |
|
|
145
|
Burrowing Owl |
BP |
SHB 7-30 pad |
contour dirt for seeding |
|
|
2 days once approved |
|
WYW125949 |
29 |
108 |
30 |
surveyed for MOPL (none present); active BUOW nest more than 1/2 mile
away |
|
146
|
Mountain Plover |
BP |
SHB 7-30 pad |
contour dirt for seeding |
|
|
2 days once approved |
|
WYW125949 |
29 |
108 |
30 |
surveyed for MOPL (none present); active BUOW nest more than 1/2 mile
away |
|
147
|
Burrowing Owl |
BP |
Corona 19-30 |
contour dirt for seeding |
|
|
2 days once approved |
|
WYW125949 |
29 |
108 |
30 |
surveyed for MOPL (none present); active BUOW nest more than 1/2 mile
away |
|
148
|
Mountain Plover |
BP |
Corona 19-30 |
contour dirt for seeding |
|
|
2 days once approved |
|
WYW125949 |
29 |
108 |
30 |
surveyed for MOPL (none present); active BUOW nest more than 1/2 mile
away |
|
149
|
Burrowing Owl |
Questar |
Stewart Point 2-20 pad; 1C4-20, 1D3-20, 8A3-20, 2D3-20 |
Drill and Complete |
|
|
05/08/08 to 08/15/08 |
|
WYW08593 |
33 |
109 |
20 |
survey for BUOW and WTPD town; none found |
|
150
|
Sage Grouse Nesting |
Questar |
Mesa 8-17 pipelines |
Install pipelines |
05/09/08 |
Granted |
05/01/08 to 05/15/08 |
5/01/2008 to 5/15/2008 |
WYW175430, 431, 435, 436 |
32 |
109 |
17 |
pipelines are new disturbance |
|
151
|
Raptor |
Shell |
Riverside 1-3 and 8-3 pads |
Install tubing |
05/09/08 |
Granted |
05/12/08 to 06/10/08 |
5/12 to 6/10/2008 |
WYW06269 |
31 |
109 |
3 |
Monitor nest |
|
152
|
Sage Grouse Nesting |
Shell |
Warbonnet 12c-14D, 12d-14D, 11c-14D |
Drill and Complete |
05/09/08 |
Denied |
05/15/08 to 07/15/08 |
|
WYW015314 |
30 |
108 |
14 |
|
|
153
|
Burrowing Owl |
Ultra |
Riverside 1-4 Simops |
build, drill, complete, run pipe, production |
05/15/08 |
Granted |
05/15/08 to 08/15/08 |
05/15/08 to 08/15/08 |
WYE 143046 |
31 |
109 |
4 |
burrowing owl surveys did not indicate any current presence of the owl
in the 2008 nest season |
|
154
|
Sage Grouse Nesting |
Encana |
Jonah Federal 6-18 and 7-18 |
construction, drilling, pipeline and reclamation |
04/15/08 |
Granted |
04/15/08 to 07/15/08 |
04/15/08 to 07/15/08 |
WYW 141883 |
28 |
108 |
18 |
There were no new leks observed within 3 miles of the worker camp confirmed
by WGFD. |
|
155
|
Sage Grouse Nesting |
TEPPCO |
Yellow Point 10-13 |
pipeline installation |
05/19/008 |
Granted |
05/19/08 to 07/29/08 |
05-28-08 to 08/08/08 |
WYW 172170 and WYW 172180 |
28 |
109 |
13 |
|
|
156
|
Raptor |
Sub Co Rd & bridge |
351 Pit |
crush gravel |
06/01/08 |
|
|
|
|
|
|
|
|
|
157
|
Sage Grouse Nesting |
Sub Co Rd & bridge |
351 Pit |
crush gravel |
06/01/08 |
|
|
|
|
|
|
|
|
|
158
|
Burrowing Owl |
Ultra |
WB 3A1-5D |
drill, complete, workover |
ongoing |
|
ongoing |
|
WYW 144994 |
30 |
108 |
5 |
|
|
159
|
Raptor |
Ultra |
Riverside 2-2 simops |
construction, drilling, completion, workover, production |
05/15/08 |
Denied |
05/15/08 to 07/31/08 |
NA |
WYW 06270 |
31 |
109 |
2 |
Hawk nest within 1/2 mile of pad. |
|
160
|
Raptor |
Ultra |
Riverside 3-3 simops pad |
construction, drilling, completion, workover, production |
05/15/08 |
Granted |
05/15/08 to 08/01/08 |
5/15/08 to 08/01/08 |
WYW 06270 |
31 |
109 |
3 |
|
|
161
|
Burrowing Owl |
Ultra |
Riverside 3-3 simops pad |
construction, drilling, completion, workover, production |
05/15/08 |
Granted |
05/15/08 to 08/01/08 |
5/15/08 to 08/01/08 |
WYW 06270 |
31 |
109 |
3 |
|
|
162
|
Sage Grouse Nesting |
Questar |
Mesa 3-17 pipeline |
pipeline installation |
05/16/08 |
Granted |
05/16/08 to 05/31/08 |
|
WYW175441 |
32 |
109 |
17 |
Winter pad |
|
163
|
Burrowing Owl |
Questar |
Mesa 3-17 pipeline |
pipeline installation |
05/16/08 |
Granted |
05/16/08 to 05/31/08 |
|
WYW175441 |
32 |
109 |
17 |
Winter pad |
|
164
|
Sage Grouse Nesting |
Questar |
Mesa 7-17 pipeline |
pipeline installation |
05/16/08 |
Granted |
05/16/08 to 05/31/08 |
|
WYW175442 |
32 |
109 |
17 |
Winter pad |
|
165
|
Sage Grouse |
BP |
SHB 9-22, 49-22, 63-22, 61-22 |
Install tubing |
05/16/08 |
Granted |
45 days |
|
WYW127749 |
29 |
108 |
22 |
Sand Draw #3 lek inactive 2008 |
|
166
|
Burrowing Owl |
BP |
SHB 9-22, 49-22, 63-22, 61-22 |
Install tubing |
05/16/08 |
Granted |
45 days |
|
WYW127749 |
29 |
108 |
22 |
no active nests within 1/2 mile |
|
167
|
Sage Grouse Nesting |
Questar |
Mesa 10-8 |
Close pits |
|
|
8 days starting |
|
WYW08589 |
32 |
109 |
8 |
|
|
168
|
Sage Grouse |
GeoEngi neers |
Chimney Butte Substation |
Geotechnical Boring |
05/19/08 |
Granted |
5/16/08-6/1/08 |
05/15/08 to 06/01/08 |
WYW175328 |
29 |
111 |
19 |
These stips did not apply to this part of the Chimney Butte Project |
|
169
|
Raptor |
GeoEngi neers |
Chimney Butte Substation |
Geotechnical Boring |
05/19/08 |
Granted |
5/16/08-6/1/08 |
05/15/08 to 06/01/08 |
WYW175328 |
29 |
111 |
19 |
These stips did not apply to this part of the Chimney Butte Project |
|
170
|
Sage-Grouse |
ENSR |
Rendezvous VI pipeline |
Construct pipeline |
05/21/08 |
Granted |
5/21/08-8-/15/08 |
05/28/08 to 08/15/08 |
WYW171677 |
28/29 |
109 |
various |
|
|
171
|
Sage Grouse Nesting |
BP |
Cabrito 34-30 |
Build location, set conductors |
05/28/08 |
Granted |
06/06/08 to 06/30/08 |
5/25/08 to 8/15/08 |
WYW102717 |
29 |
107 |
30 |
|
|
172
|
Raptor |
BP |
Cabrito 34-30 |
Build location, set conductors |
|
|
06/06/08 to 06/30/08 |
|
WYW102717 |
29 |
107 |
30 |
no active nests within 1-mile |
|
173
|
Sage Grouse Nesting |
BP |
SHB 25-22 Pad |
Build production facilities and complete wells |
|
|
07/01/08 to 08/15/08 |
|
WYW127749 |
29 |
108 |
22 |
|
|
174
|
Burrowing Owl |
BP |
SHB 25-22 Pad |
Build production facilities and complete wells |
|
|
07/01/08 to 08/15/08 |
|
WYW127749 |
29 |
108 |
22 |
|
|
175
|
Sage Grouse Nesting |
Questar |
Stewart Point 7-28 |
Arch testing and mitigation |
|
|
05/15/08 to 07/31/08 |
|
WYW015315 |
33 |
109 |
28 |
|
|
176
|
Raptor |
Questar |
Stewart Point 7-28 |
Arch testing and mitigation |
|
|
05/15/08 to 07/31/08 |
|
WYW015315 |
33 |
109 |
28 |
|
|
177
|
Raptor |
Sublette County |
County Road 23-123 |
Construct road |
|
|
05/01/08 to 07/31/08 |
|
WYW172254 |
33 |
109 |
various |
|
|
178
|
Sage Grouse Nesting |
Sublette County |
County Road 23-123 |
Construct road |
|
|
05/01/08 to 07/31/08 |
|
WYW172254 |
33 |
109 |
various |
|
|
179
|
Raptor |
Wyoming Wildlife Consultants, LLC |
James Gravel Pit |
continue gravel pit operations |
05/21/08 |
|
5/01/08-8/15/08 |
|
WYW172275 |
34 |
111 |
21 |
|
|
180
|
Bald Eagle |
Wyoming Wildlife Consultants, LLC |
James Gravel Pit |
continue gravel pit operations |
05/21/08 |
|
5/01/08-8/15/08 |
|
WYW172275 |
34 |
111 |
21 |
|
|
181
|
Sage Grouse Nesting |
JGG |
2589 ft. pipeline from Yellow Point 10-13 |
Install pipelines |
|
|
5/19/08 to 7/28/08 |
|
WYW172170/172180 |
28 |
109 |
13 |
Yellowpoint lek inactive 2008 and for several years. |
|
182
|
Sage Grouse Nesting |
Shell |
Mesa 11c-35D,12b-35D,11d-35D,12c-35D,12d-35D |
Construct and drill |
05/28/08 |
Granted |
05/28/08 to 07/15/08 |
5/28/08 to 7/15/08 |
WYW06286 |
32 |
109 |
35 |
|
|
183
|
Burrowing Owl |
Shell |
Mesa 11c-35D,12b-35D,11d-35D,12c-35D,12d-35D |
Construct and drill |
05/28/08 |
Granted |
05/28/08 to 07/15/08 |
5/28/08 to 7/15/08 |
WYW06286 |
32 |
109 |
35 |
|
|
184
|
Raptor |
Shell |
Mesa 11c-35D,12b-35D,11d-35D,12c-35D,12d-35D |
Construct and drill |
05/28/08 |
Granted |
05/28/08 to 07/15/08 |
5/28/08 to 7/15/08 |
WYW06286 |
32 |
109 |
35 |
|
|
185
|
Burrowing Owl |
ENSR |
Rendezvous VI pipeline |
Construct pipeline |
05/28/08 |
Granted |
06/06/08 to 06/30/08 |
5/25/08 to 8/15/08 |
WYW171677 |
28 |
109 |
22 |
|
|
186
|
Sage Grouse Nesting |
Shell |
Mesa 8b-29DX |
remove tubing and failed DTS |
05/29/08 |
Denied |
06/03/08 to 06/16/08 |
|
WYW118165 |
32 |
109 |
29 |
|
|
187
|
Burrowing Owl |
Ultra |
Riverside 3-3 simops pad |
construction, drilling, completion, workover, production |
|
|
05/15/08 to 08/01/08 |
|
WYW 06270 |
31 |
109 |
3 |
|
|
188
|
Raptor |
Ultra |
Riverside 3-3 simops pad |
construction, drilling, completion, workover, production |
|
|
05/15/08 to 08/01/08 |
|
WYW 06270 |
31 |
109 |
3 |
|
|
189
|
Sage Grouse Nesting |
Questar |
Mesa 7-17 pipeline |
pipeline installation |
g |
|
06/01/08 to 06/16/08 |
6/01/08 to 6/16/08 |
WYW175442 |
32 |
109 |
17 |
Winter pad |
|
190
|
Raptor |
Ultra |
Riverside 8A1-10D (Riverside 4-11 simops pad) |
Construct, Drill, Complete |
05/29/08 |
Granted |
06/01/08 to 08/15/08 |
6/01/2008 to 8/15/2008 |
WYW06270 |
31 |
109 |
11 |
|
|
191
|
Burrowing Owl |
Ultra |
Riverside 8A1-10D (Riverside 4-11 simops pad) |
Construct, Drill, Complete |
05/29/08 |
Granted |
06/01/08 to 08/15/08 |
6/01/2008 to 8/15/2008 |
WYW06270 |
31 |
109 |
11 |
|
|
192
|
Raptor |
BP |
Cabrito 41-30, 37-30, 39-30, 43-30 |
Build location |
05/29/08 |
Granted |
6/1/08 to 7/31/08 |
6/01/2008 to 7/31/2008 |
WYW102717 |
29 |
107 |
30 |
3 surveys 2008, no active raptor nests within 1 mile |
|
193
|
Burrowing Owl |
Encana |
Stud Horse Butte 67-28 |
Spred cuttings |
05/30/08 |
Granted |
6/15/08 to 6/16/08 |
6/15/2008 to 6/16/2008 |
WYW125590 |
29 |
108 |
28 |
Owls will be monitored |
|
194
|
Sage Grouse Nesting |
Questar |
Mesa Water Loop pipeline |
Dig up flanges, install liner |
05/30/08 |
Denied |
06/01/08 to 07/15/08 |
|
WYW172255/172256 |
31 |
109 |
various |
|
|
195
|
Raptor |
Questar |
Mesa Water Loop pipeline |
Dig up flanges, install liner |
05/30/08 |
Denied |
06/01/08 to 07/15/08 |
|
WYW172255/172256 |
31 |
109 |
various |
|
|
196
|
Raptor |
Encana |
Cabrito 57-30 |
Build pad |
05/30/08 |
Granted |
5/20/08 to competion |
05/06/2008 to 7/31/2008 |
WYW102717 |
29 |
107 |
30 |
no active raptor nests 2008 within 1 mile |
|
197
|
Mountain Plover |
Encana |
Cabrito 57-30 |
Build pad |
05/30/08 |
Granted |
5/20/08 to competion |
05/06/2008 to 7/31/2008 |
WYW102717 |
29 |
107 |
30 |
survey-no mountain plovers |
|
198
|
Sage Grouse Nesting |
ENSR |
Rendezvous VI and Mesa Loop pipelines |
Contstuct pipelines |
06/02/08 |
Denied |
Immediately to completion |
|
WYW171677/171678 |
various |
various |
various |
|
|
199
|
Raptor |
ENSR |
Rendezvous VI and Mesa Loop pipelines |
Contstuct pipelines |
06/02/08 |
Denied |
Immediately to completion |
|
WYW171677/171678 |
various |
various |
various |
|
|
200
|
Raptor |
Union |
Cottonwood Butte Communication Site |
Construct/install cell tower |
06/05/08 |
Denied |
Immediately to completion |
|
|
32 |
111 |
29 |
Active FH nest within 1-mile |
|
201
|
Raptor |
Ultra |
Mesa 9-28 Simops pad |
construction, drilling, completion, workover, production |
06/05/08 |
Granted |
07/15/08 to 08/15/08 |
07/15/08 to 08/15/08 |
WYW06286 |
32 |
109 |
28 |
|
|
202
|
Burrowing Owl |
Ultra |
Mesa 9-28 Simops pad |
construction, drilling, completion, workover, production |
06/05/08 |
Granted |
7/15/08 to 08/15/2008 |
07/15/08 to 08/15/08 |
WYW06286 |
32 |
109 |
28 |
|
|
203
|
Sage Grouse Nesting |
Newfield |
Antelope 3-4D |
production log |
06/23/08 |
Granted |
06/23/08 to 06/27/08 |
06/23/08 to 06/27/08 |
WYW 133051 |
29 |
107 |
4 |
its actually a maintenance action |
|
204
|
Sage Grouse Nesting |
QGM |
Rendezvous VI and Mesa Loop pipelines |
construction of pipeline and potholing |
06/07/08 |
Granted |
06/07/08 to 07/01/08 |
06/07/08 to 07/01/08 |
WYW 172133 |
32 |
109 |
7,8,17,21,27,28 and 34 |
|
|
205
|
Burrowing Owl |
QGM |
Rendezvous VI and Mesa Loop pipelines |
construction of pipeline and potholing |
06/07/08 |
Granted |
06/07/08 to 07/01/08 |
06/07/08 to 07/01/08 |
WYW 172133 |
32 |
109 |
7,8,17,21,27,28 and 34 |
|
|
206
|
Raptor |
QGM |
Rendezvous VI and Mesa Loop pipelines |
construction of pipeline and potholing |
06/07/08 |
Granted |
06/07/08 to 07/01/08 |
06/07/08 to 07/01/08 |
WYW 172133 |
32 |
109 |
7,8,17,21,27,28 and 34 |
|
|
207
|
Sage Grouse Nesting |
CenturyTel |
Fiber Optic line from Sand Draw to BP Office |
installation of fiber optic line |
06/13/08 |
Granted |
Immediately to completion |
06/13/2008-08/15/2008 |
WYW175380 |
various |
various |
various |
|
|
208
|
Burrowing Owl |
CenturyTel |
Fiber Optic line from Sand Draw to BP Office |
installation of fiber optic line |
06/13/08 |
Granted |
Immediately to completion |
06/13/2008-08/15/2008 |
WYW175380 |
various |
various |
various |
|
|
209
|
Raptor |
CenturyTel |
Fiber Optic line from Sand Draw to BP Office |
installation of fiber optic line |
06/13/08 |
Granted |
Immediately to completion |
06/13/2008-08/15/2008 |
WYW175380 |
various |
various |
various |
|
|
210
|
Mountain Plover |
CenturyTel |
Fiber Optic line from Sand Draw to BP Office |
installation of fiber optic line |
06/13/08 |
Granted |
Immediately to completion |
06/13/2008-08/15/2008 |
WYW175380 |
various |
various |
various |
|
|
211
|
Burrowing Owl |
Encana |
Various Jonah Federal, Yellow Point, & Stud Horse Butte wells |
Reclamation activities |
|
|
6/15/08 to 8/15/08 |
|
|
|
|
|
Aster Canyon 2008 field-wide monitoring data used. |
|
212
|
Sage Grouse |
Encana |
Various Jonah Federal, Yellow Point, & Stud Horse Butte wells |
Reclamation activities |
06/16/08 |
Granted |
7/1/08 to 8/15/08 |
6/15/08 to 8/18/08 |
|
|
|
|
Aster Canyon 2008 field-wide monitoring data used. |
|
213
|
Sage Grouse |
Encana |
Stud Horse Butte 32-10, 53-10, 17-15, 31-15 |
Reclamation activities |
06/16/08 |
Partially Granted |
7/1/08 to 8/15/08 |
7/9/08 to 8/15/08 |
|
|
|
|
Aster Canyon 2008 field-wide monitoring data used. |
|
214
|
Raptor |
JGG |
Riverside 1-4 pipeline size change |
pipeline installation |
06/17/08 |
Granted |
Immediately to completion |
|
WYW153503 AM #1 |
31 |
109 |
4 |
|
|
215
|
Burrowing Owl |
JGG |
Riverside 1-4 pipeline size change |
pipeline installation |
06/17/08 |
Granted |
Immediately to completion |
|
WYW153503 AM #1 |
31 |
109 |
4 |
|
|
216
|
Pygmy Rabbit |
JGG |
Riverside 1-4 pipeline size change |
pipeline installation |
06/17/08 |
Granted |
Immediately to completion |
|
WYW153503 AM #1 |
31 |
109 |
4 |
|
|
217
|
Sage Grouse Nesting |
JGG |
Riverside 1-4 pipeline size change |
pipeline installation |
06/17/08 |
Granted |
Immediately to completion |
|
WYW153503 AM #1 |
31 |
109 |
4 |
|
|
218
|
Sage Grouse Nesting |
Newfield |
Rainbow 49-31D and 65-31D |
drilling activities |
06/25/08 |
Denied |
Immediately to completion |
|
WYW118148 |
30 |
107 |
31 |
2 active grouse leks within 2 miles |
|
219
|
raptor nesting |
Ultra |
Riverside 13A-12D |
OBM pit, conductors, move rig, rig up |
07/15/08 |
Denied |
07/15/08 to08/01/08 |
|
WYW 06270 |
31 |
109 |
12 |
2 active raptor nests within 1/4 mile |
|
220
|
sage grouse |
Ultra |
Warbonnet 13B1-13 |
construct location, dig pit, set conductor and drill |
07/01/08 |
Denied |
07/01/08 to 07/15/08 |
|
WYW 016161 |
30 |
108 |
13 |
active sage grouse lek 1 mile |
|
221
|
Burrowing Owl |
Encana |
Stud Horse Butte 33-22, 48-22, 47-22 |
Drill and Complete |
06/23/08 |
Granted |
7/2/08 to 8/15/08 |
7/02/08 to 8/15/08 |
WYW127749 |
29 |
108 |
22 |
burrowing owl surveys done -- no active burrowing owl < 1/2 mile |
|
222
|
Sage Grouse Nesting |
Encana |
Stud Horse Butte 33-22, 48-22, 47-22 |
Drill and Complete |
06/23/08 |
Granted |
7/2/08 to 8/15/08 |
7/2/08 to 8/15/08 |
WYW127749 |
29 |
108 |
22 |
Within intensive development and next to BP drill rig |
|
223
|
Sage Grouse Nesting |
Shell |
B5A-35 Injection Well |
Repair casing |
06/25/08 |
Granted |
7/7/08-7/15/08 |
7/7/08 to 7/15/08 |
WYW014074 |
29 |
113 |
35 |
|
|
224
|
Burrowing Owl |
Shell |
11b. 13b, 12b, 12c, 14b, 13c, and 13d-34D |
install tubing and pad construction |
06/26/08 |
Granted |
07/07/08 to completion |
After 7/11/08 |
WYW06286 |
32 |
109 |
34 |
Waiting until July 11th to begin construction due to MOPL stipulation |
|
225
|
raptor |
Shell |
11b. 13b, 12b, 12c, 14b, 13c, and 13d-34D |
install tubing and pad construction |
06/26/08 |
Granted |
asap -- 5-7 weeks |
After 7/11/08 |
WYW06286 |
32 |
109 |
34 |
Waiting until July 11th to begin construction due to MOPL stipulation |
|
226
|
Burrowing Owl |
Shell |
1ar-23 |
conduct soil sample boring for one day; drill on July 16th |
06/30/08 |
Granted |
1 day immediately; July 16th to completion |
7/01/08 to 7/15/08 |
WYW026025 |
31 |
109 |
23 |
exception is to do soil boring one day immediately; 2nd half of exception
is for BUOW relief starting July 16th to completion |
|
227
|
Sage Grouse Nesting |
Shell |
1ar-23 |
conduct soil sample boring for one day; drill on July 16th |
06/30/08 |
Granted |
2 day immediately; July 16th to completion |
7/01/08 to 7/15/08 |
WYW026025 |
|
|
|
|
|
228
|
Sage Grouse Nesting |
Shell |
Mesa 3c-28d, 3d-28d, 3b-28dx, 1d-29d, 8c-29d |
Construct and drill |
06/27/08 |
Denied |
06/30/08 to 07/15/08 |
|
WYW118165 |
32 |
109 |
28 |
|
|
229
|
Raptor |
EOG |
GRBU T-139-27, 140-27, 137-34,126-02D,200-30D |
Construct location and begin drilling |
07/02/08 |
Granted |
7/16-7/31 2008 |
7/16/08 to 7/31/08 |
WYW040934,WYE07675C,WYE07798E,WYW025410 |
various |
various |
various |
|
|
230
|
Sage Grouse Nesting |
Questar |
Stewart Point 11B3-32 and 14D3-29 |
Construct pad |
07/03/08 |
Denied |
07/07/08 to 07/15/08 |
|
WYW015315 |
33 |
109 |
32 |
|
|
231
|
Burrowing Owl |
Ultra |
9A1-3D |
Construct, Drill, Complete |
07/08/08 |
Granted |
06/01/08 to 08/15/08 |
7/08/08 to 08/15/08 |
WYW06270 |
31 |
109 |
3 |
|
|
232
|
raptor |
Ultra |
9A1-3D |
Construct, Drill, Complete |
07/08/08 |
Granted |
06/01/08 to 08/15/08 |
7/08/08 to 08/15/08 |
WYW06270 |
31 |
109 |
3 |
|
|
233
|
raptor |
Sublette County |
County Road 23-123 |
Construction |
|
|
07/15/08 to completion |
|
WYW172254 |
33 |
109 |
various |
station 120+10 to 134+06 |
|
234
|
raptor |
Questar |
SP 1C33-30 and SP7D3-33 |
Pad Construction |
07/08/08 |
Granted |
07/16/08 to 07/31/08 |
07/16/08 to 07/31/08 |
WYW08592 |
33 |
109 |
33 |
|
|
235
|
raptor |
Questar |
SP 13C3-20 |
Pad Construction |
07/08/08 |
Granted |
07/16/08 to 07/31/08 |
7/16/08 to 7/31/08 |
WYW016167 |
33 |
109 |
30 |
|
|
236
|
Burrowing Owl |
Ultra |
Riverside 1a1-9 (1-9 pad) |
Construct, Drill, Complete |
|
|
07/16/08 to 08/15/08 |
|
WYW143046 |
31 |
109 |
9 |
|
|
237
|
Burrowing Owl |
Shell |
Warbonnett Gathering System |
Install pipelines |
07/08/08 |
Granted |
07/16/08 to 08/15/08 |
|
WYW175396-175467 |
30 |
108 |
various |
|
|
238
|
raptor |
Shell |
Warbonnett Gathering System |
Install pipelines |
|
|
07/16/08 to 08/15/08 |
|
WYW175396-175467 |
30 |
108 |
various |
|
|
239
|
raptor |
Anschutz |
Mesa 11-19 |
Construct, Drill, Complete |
|
|
07/15/08 to 07/31/08 |
|
WYW135123 |
32 |
109 |
19 |
|
|
240
|
Burrowing Owl |
Shell |
Boulder 1a-32D, 1b-32D, 8b-32D, 7b-32D |
Completions |
07/10/08 |
Granted |
07/16/08 to 08/15/08 |
07/16/08 to08/15/08 |
WYW015316 |
31 |
108 |
32 |
|
|
241
|
raptor |
ENSR |
Rendezvous 6 |
Construct and withdraw water from New Fork |
07/15/08 |
Granted |
07/15/08 to 07/31/08 |
7/15/2008 to 7/31/2008 |
WYW171677 and WYW171678 |
31 |
109 |
11, 12, 14 |
|
|
242
|
raptor |
ENSR |
Rendezvous 6 |
pipeline installation |
07/16/08 |
Granted |
07/15/08 to 07/31/08 |
7/15/2008 to 7/31/2008 |
WYW171677 |
30 |
108 |
9 |
No active nests within 1-mile |
|
243
|
raptor |
ENSR |
Rendezvous 6 |
pipeline installation |
|
|
07/15/08 to 07/31/08 |
|
WYW171677 |
29 |
108 |
5 |
No active nests within 1-mile |
|
244
|
Burrowing Owl |
ENSR |
Rendezvous 6 |
pipeline installation/road boring |
07/16/08 |
Denied |
07/15/08 tp 08/15/08 |
|
WYW171677 |
31 |
108 |
33 |
|
|
245
|
Sage Grouse Nesting |
Encana |
Stud Horse Butte 75-11, 74-11 |
Build and Drill |
07/10/08 |
Denied |
7/8/08 to 7/15/08 |
NA |
WYW144998 |
29 |
108 |
11 |
|
|
246
|
Burrowing Owl |
ENSR |
Rendezvous 6 |
pipeline installation/road boring |
|
|
07/15/08 tp 08/15/08 |
|
WYW171677 |
31 |
108 |
33 |
|
|
247
|
Burrowing Owl |
JGG |
Anticline Loop pipeline |
pipeline installation |
07/22/08 |
Granted |
08/01/08 thru 08/15/08 |
08/01/2008 to 8/15/2008 |
WYW175305, 306 & AM1 |
32 |
109 |
27 |
No active BUOW nests within 1/2 mile |
|
248
|
raptor |
Questar |
Mesa 11-20 pad |
Pad expansion |
07/30/08 |
Granted |
07/30/08 thru 07/31/08 |
7/30/08 to 07/31/08 |
WYW015315 |
32 |
109 |
20 |
no active raptor nests 2008 within 1 mile |