2009-2010 Wildlife Exceptions
Exception requests that span extensive lengths of time are not fully granted because the wildlife staff cannot adequately analyze impacts over such long periods of time. Such requests are sometimes given partial grants that enable work over shorter periods of time and are then reevaluated for extensions to the original exception. This table includes the original request and each extension evaluated for each location.
COA Legend
BO = burrowing owl
FEHA = ferruginous hawk
BG CWR = big game crucial winter range
SG = sage grouse
CWR = crucial winter range
BE = bald eagle
For further information or to obtain copies of completed documents, please contact John Huston at 307-367-5385.
|
COA |
Company |
Location / Wells |
Requested Action |
Action date |
Action Status |
Requested dates |
Dates excepted |
Lease/ROW |
Town(N) |
Range(W) |
Sec. |
Remarks |
1 |
SG, BG CWR, FH |
SWEPI LP |
Mesa 13-35 |
construction, drilling, completions, facility maintenance |
02/25/10 |
Granted |
02/25/2010 to 08/2010 |
02/25/2010 to 08/2010 |
WYW 015314 |
32 |
109 |
35 |
|
2 |
SG, BG CWR, FH |
Questar |
Mesa 3-21 |
Drlling, completions, set facilities, install flow lines, gathering facilities |
10/28/09 |
Granted |
02/25/2010 to 08/2010 |
02/25/2010 to 08/2010 |
WYW 015317 |
32 |
109 |
21 |
|
3 |
BG CWR, FH |
SWEPI LP |
Mesa 1-27 |
construction, drilling, completions, facility maintenance |
11/15/09 |
Granted |
11/15/09 to 04/30/2010 |
11/15/09 to 04/30/2010 |
WYW 116265 |
32 |
109 |
27 |
|
4 |
BG CWR, SG |
SWEPI LP |
Mesa 12-28 |
construction, drilling, completions, facility maintenance |
04/01/10 |
Granted |
04/01/2010 to 07/15/2011 |
04/01/2010 to 07/15/2011 |
WYW 118165 |
32 |
109 |
28 |
|
5 |
BG CWR, SG |
SWEPI LP |
Boulder 11-19 |
construction, drilling, completions, facility maintenance |
10/01/09 |
Granted |
10/01/2009 to 03/2010 |
10/01/09 to 03/01/2010 |
WYW 144993 |
31 |
108 |
19 |
|
6 |
BG CWR, SG |
Questar |
Mesa 7-22 |
construction, drilling, completions, install flow lines, gathering facilities |
10/08/09 |
Granted |
10/08/09 to 07/15/2010 |
10/26/09 to 07/15/2010 |
WYW 015317 |
32 |
109 |
22 |
|
7 |
BG CWR, SG |
Questar |
Mesa 8-19 |
construction, drilling, completions, install flow lines, gathering facilities |
10/08/09 |
Granted |
10/08/09 to 07/15/2010 |
10/26/09 to 07/15/2010 |
WYW 015315 |
32 |
109 |
19 |
|
8 |
BG CWR |
SWEPI LP |
North LGS Facility |
complete construction |
11/15/09 |
|
11/15/09 to 04/30/2010 |
|
WYW 176891 |
31 |
109 |
3 |
|
9 |
BG CWR |
Cimarex |
Riley Ridge 20-14 |
Finish Drilling and rig down |
11/12/09 |
Partial |
11/15/09 to 12/01/09 |
11/15/09 to 12/1/09 |
WYW 60620,59398 |
29 |
114 |
17 |
|
10 |
BG |
Questar |
Stewart Point et al |
Construction of pad and pit, set trench boxes, install cellars, move casing |
11/10/09 |
denied |
11/15/09 to 12/01/09 |
|
|
|
|
|
SP 14-32, SP 11-21, SP 5-17, SP 12D4-29, within delineation area of DA 1 |
11 |
BG CWR, BEWinter |
Town of La Barge |
east of town |
Drill 20 test holes and 1-3 wells for potential water supply |
11/12/09 |
Granted |
11/15/09 to 12/12/09 |
11/15/09 to 12/12/09 |
WYW 172096 |
26 |
112 |
5 |
|
12 |
BG CWR |
Exxon |
Fiber Optic Line |
Install overhead fiber optic lines |
11/16/09 |
|
11/15/09 to 11/30/09 |
|
not given |
28 |
114 |
10,15,20,21,22,27,28 |
|
13 |
BG CWR |
Questar |
Mesa 15-20 |
completion and flowback equip and activities |
11/01/09 |
Granted |
11/01/09 to 12/01/09 |
11/01/09 to 12/01/09 |
WYW 015315 |
32 |
109 |
29, 20 |
Within DA 1 CDA |
14 |
BG CWR |
Questar |
Mesa 8-19 |
completion and flowback equip and activities |
11/01/09 |
Granted |
11/01/09 to 12/01/09 |
11/01/09 to 12/01/09 |
WYW 015315 |
32 |
109 |
19 |
Within DA 1 CDA |
15 |
BG CWR |
Questar |
Mesa 12-21 |
equipment and activities necessary for full interim reclamation |
11/01/09 |
Granted |
11/01/09 to 11/22/09 |
11/01/09 to 11/22/09 |
WYW 015315 |
32 |
109 |
21 |
Within DA 1 CDA |
16 |
BG CWR |
Questar |
Mesa 16-19 |
completion and flowback, install flow lines, install gather lines, install gas pipeline LGS QGM ROW WYW 176921, 176920, 176919 |
11/03/09 |
Granted |
11/03/09 to 07/15/09 |
11/03/09 to 07/15/09 |
WYW 015315 |
32 |
109 |
19 |
Within DA 1 CDA |
17 |
BG CWR, SG |
Questar |
Mesa 3-22 pad |
construction pad expansion, drilling, completions, install flowlines, install gather lines, production facillities, pipeline, LGS, QGM loop line |
11/03/09 |
Granted |
11/03/09 to 07/15/09 |
11/03/09 to 07/15/09 |
WYW 015317 |
32 |
109 |
22, 15 |
Within DA 1 CDA |
18 |
BG CWR |
Questar |
Mesa 8-30 pad |
equipment and complete installation water disposal facility and cleanup |
11/01/09 |
Granted |
11/01/09 to 11/22/09 |
11/01/09 to 11/22/09 |
WYW 160992 |
32 |
109 |
30 |
Within DA 1 CDA |
19 |
BG CWR |
SWEPI LP |
North LGS Facility |
complete construction |
11/15/09 |
Granted |
11/15/09 to 04/30/10 |
11/15/09 to 04/30/10 |
WYW 176891 |
31 |
109 |
3 |
Within Core DA2 |
20 |
BE roost & BG CWR |
SWEPI LP |
Central LGS pipeline |
finish reclamation of LGS |
11/01/09 |
Granted |
11/01/09 to 12/01/09 |
11/01/09 to 12/01/09 |
WYW 17793, 176794,WYW 176768, 176769, 176779, 176780, 176760, 176778, 176770, 176661, 176772, 176663, 176774,WYW 176785, 176786, 176787, 176788, 176789, 176790, 176795, 176796, 176770, 176771, 176772, 176773, 176774 |
31 |
109 and 108 |
S 13, 14, 23, and 24 T 31N R109W,S 19, 29, 30, T31N R108 W and S 13, 14, 24, 25, T31N R109W,S 19, 29, 30, T31N R108 W and S 13, 14, 24, 25, T31N R109W |
To bring vegetation back in delineation area |
21 |
BG CWR |
SWEPI LP |
North LGS Facility, Mesa 7-29 |
install pipe racks for LGS, install piping, tubing, cable trays, and installation |
11/15/09 |
Granted |
11/15/09 to 12/01/09 |
11/15/09 to 12/01/09 |
WYW 118165 |
32 |
109 |
29 |
Within Core DA2 |
22 |
BG CWR |
SWEPI LP |
Boulder 11-19 |
completion |
03/01/09 |
Granted |
03/01/10 to 03/14/10 |
03/01/10 to 03/14/10 |
WYW 144993 |
31 |
108 |
19 |
no extension into SG nesting |
23 |
BG CWR |
Questar |
Mesa 6-5, Mesa 6-7, SP, 1-29, SP 5-17, SP 14-32, SP 12-29, SP 11-21 |
Construction of pad and pit, set trench boxes, install cellars, move casing |
11/15/09 |
Granted |
11/15/09 to 12/01/09 |
11/15/09 to 12/01/09 |
|
|
|
|
Denial rescinded due to ability to complete delineation by 2010 and BLM processing requests before Nov 15 |
24 |
BG CWR |
SWEPI LP |
Mesa 5-26 |
store completion equipment, 20 water tanks, additional vehicle parking for the Mesa 5-26 |
11/15/09 |
Granted |
11/15/09 to 02/07/10 |
11/15/09 to 02/07/10 |
WYW 116265 |
32 |
109 |
26 |
Within Core DA2 |
25 |
BG CWR, SG |
SWEPI LP |
Mesa 12-33 |
completion equipment storage & parking 12 hr shift |
11/06/09 |
Granted |
11/06/09 to 06/01/10 |
11/06/09 to 06/01/10 |
WYW 118165 |
32 |
109 |
33 |
Within Core DA2 |
26 |
BG CWR, SG |
SWEPI LP |
Mesa 12-28 |
construction, drilling, completion, facility |
11/15/09 |
Granted |
11/15/09 to 03/31/09 |
11/15/09 to 03/31/09 |
WYW 118165 |
32 |
109 |
28 |
Within Core DA2 |
27 |
BG CWR, SG |
SWEPI LP |
Mesa 1-27 |
completion activities |
01/01/10 |
Granted |
01/01/2010 to 02/07/2010 |
01/01/2010 to 02/07/2010 |
WYW 116265 |
32 |
109 |
27 |
Within Core DA2 |
28 |
BG CWR |
SWEPI LP |
mesa 7-29 |
Pit closure |
11/16/09 |
Granted |
11/16/09 to 12/15/09 |
11/16/09 to 12/15/09 |
WYW 118165 |
32 |
109 |
29 |
Within CDA DA 1 |
29 |
BG CWR |
QGM |
Lovatt Dr Water Ext |
complete construction, testing, cleanup |
11/15/09 |
Withdrawn |
11/15/09 to 11/30/09 |
|
WYW 176922 |
32 |
109 |
17,19,30 |
Completed request before Nov 15 |
30 |
BG CWR, BEWinter |
Questar |
T-7 |
reclaim groundwater well location, backfill sump/pit to contain drill cuttings and water spread topsoil, backfill pit, seed |
11/20/2009 |
Granted |
11/20/09 to 11/26/09 |
11/20/09 to 11/26/09 |
WYW 176987, 176988 |
33 |
110 |
2 |
|
31 |
BG CWR |
Ultra |
T-6 |
reclaim groundwater well location, backfill sump/pit to contain drill cuttings and water spread topsoil, backfill pit, seed |
11/20/2009 |
Granted |
11/20/09 to 11/26/09 |
11/20/09 to 11/26/09 |
WYW 176986 |
31 |
109 |
30 |
|
32 |
BG CWR |
Questar |
T-2a |
reclaim area using hand shovels to remove drill cutings, tire ruts, reclaim |
11/20/2009 |
Granted |
11/20/09 to 11/26/09 |
11/20/09 to 11/26/09 |
WYW 176983 |
32 |
110 |
12 |
|
33 |
BG CWR |
SWEPI LP |
Nortern Liq Gathering Hook Ups |
Install pipe racks for LGS, install piping, tubing, cable trays, and installation on the Riverside 6-4, New Fork 7-3, Riversie 8-3, Riverside 13-3, Mesa 12-33, Mesa 12-34 |
11/25/09 |
Granted |
11/25/09 to 02/01/2010 |
11/25/09 to 02/01/2010 |
WYW 118165, 06270, 06286 |
31,32 |
109 |
3,4,33,34 |
All activities are occuring on the developed pad location , no ground disturbance during daylight hrs |
34 |
BG CWR |
Chevron |
Birch Creek 205-14 |
Erosion control to protect cultural site |
11/24/09 |
Granted |
11/15/09 to 11/19/09 |
11/15/09 to 11/19/09 |
WYE022644 |
27 |
113 |
15 |
|
35 |
BG CWR |
Exxon |
Fiber Optic Line |
Install overhead line |
11/24/09 |
denied |
11/15/2009 to 11/30/2009 |
|
|
|
|
|
|
36 |
BG |
R-Y Timber |
Salvage Timber |
Wrap up beetle kill tree salvage on Zach Roberts' property |
12/02/09 |
Granted |
|
11/15/09 to 12/12/09 |
|
|
|
|
|
37 |
BE roost |
Ultra |
Riverside 4-11 Simops |
Fraccing & drilling out plugs |
12/02/09 |
Granted |
11/1/09 to 01/31/10 |
12/6/09 to 01/31/10 |
WYW06270 |
31 |
109 |
11 |
|
38 |
BG CWR |
Chevron |
LBU 27, 28A,35, 38 |
Replace gas fired pumps with electric pumps |
12/14/09 |
Withdrawn |
12/7/09 to 12/14/09 |
|
WYW 109568X |
27 |
113 |
22, 27, 35 |
|
39 |
BG CWR |
Union |
Boulder Telecom site |
Install communication tower on wheels and powerline is access rd |
12/17/09 |
Granted |
12/17/09 to 04/30/09 |
12/17/09 to 02/28/09 |
WYW 176761 and 176762 |
31 |
108 |
10 |
This is a temporary tower, ground disturbing activities will only occur for the powerline construction in the access road |
40 |
BG CWR, Raptor |
WY DEQ |
Boulder Air Station |
winter ozone studies |
12/22/09 |
Granted |
12/22/09 to 04/30/10 |
12/22/09 to 04/30/10 |
WYW 161480 |
32 |
108 |
29 |
|
41 |
SG, FH, BO,Raptor |
Encana |
Jonah field wide block exception |
exception to coa's of non-active raptor nests |
12/29/09 |
Granted |
2/1/10 to 815/10 |
2/1/10 to 7/31/10 |
JIDPA |
|
|
|
Block exception in the Jonah Infill Drilling Project Area: drilling, completion, production, & reclamation |
42 |
BG, Raptor |
Ultra |
RS 3-3 |
Drilling and Completion Operations |
11/15/09 |
Granted Partial |
11/15/09 to 02/28/10 |
11/15/09 to 02/28/10 |
WYW 06270 |
31 |
109 |
3 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
43 |
BG, SG, Raptor |
Ultra |
RS 2-2 |
Drilling and Completion Operations |
11/15/09 |
Granted Partial |
11/15/09 to 02/28/10 |
11/15/09 to 02/28/10 |
WYW 06270 |
31 |
109 |
2 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
44 |
BG |
Ultra |
RS 16-3 |
Drilling and Completion Operations |
11/15/09 |
Granted |
11/15/09 to 04/30/10 |
11/15/09 to 04/30/10 |
WYW 06270 |
31 |
109 |
3 |
|
45 |
RG, SG, Raptor |
Ultra |
RS 5-1 |
Drilling and Completion Operations |
11/15/09 |
Granted |
11/15/09 to 02/28/10 |
11/15/09 to 02/28/10 |
WYW 06270 |
31 |
109 |
1 |
Due to previous and ongoing disturbance in this area |
46 |
BG, Raptor |
Ultra |
RS 9-2 |
Drilling and Completion Operations |
11/15/09 |
Granted |
11/15/09 to 02/28/10 |
11/15/09 to 02/28/10 |
WYW 06270 |
31 |
109 |
2 |
Due to previous and ongoing disturbance in this area |
47 |
BG, Raptor |
Ultra |
RS 4-10 |
Drilling and Completion Operations |
11/15/09 |
Granted Partial |
11/15/09 to 02/28/10 |
11/15/09 to 02/28/10 |
WYW 06270 |
31 |
109 |
|
Due to lack of raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
48 |
BG |
Ultra |
RS 1-4 |
Completions Operations |
11/15/09 |
Granted |
11/15/09 to 01/01/10 |
11/15/09 to 01/01/10 |
WYW 143046 |
31 |
109 |
4 |
Within Core DA2 |
49 |
BG, Raptor |
Ultra |
RS 5-2 |
Construction, Drilling, and Completions Operations |
11/15/09 |
Grant Partial |
11/15/09 to 02/28/10 |
11/15/09 to 02/28/10 |
WYW 06270 |
31 |
109 |
2 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
50 |
BG |
Ultra |
RS 7-28 |
Drilling, Completion, and Construction Operations |
11/15/09 |
Granted |
11/15/09 to 04/30/10 |
11/15/09 to 04/30/10 |
WYW 06286 |
32 |
109 |
28 |
Within Core DA2 |
51 |
BG, SG |
Ultra |
MS 10-33 |
Drilling, Completion, and Construction Operations |
11/15/09 |
Granted |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
33 |
Within Core DA2 |
52 |
BG, SG, Raptor |
Ultra |
MS 15-27 |
Drilling and Completion Operations |
11/15/09 |
Grant Partial |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
27 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
53 |
BG, SG, Raptor |
Ultra |
MS 9-34 |
Drilling and Completion Operations |
11/15/09 |
Grant Partial |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
34 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
54 |
BG, SG |
Ultra |
MS 9-28 |
Drilling and Completion Operations |
11/15/09 |
Granted |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
28 |
Within Core DA2 |
55 |
BG, SG, Raptor |
Ultra |
MS 4-34 |
Drilling, Completion, and Construction Operations |
11/15/09 |
Grant Partial |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
34 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
56 |
BG, SG, Raptor |
Ultra |
MS 1-33 |
Drilling and Completion Operations |
11/15/09 |
Grant Partial |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
33 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
57 |
BG, SG, Raptor |
Ultra |
MS 12-27 |
Completion Operations |
11/15/09 |
Grant Partial |
11/15/09 to 07/15/10 |
11/15/09 to 07/15/10 |
WYW 06286 |
32 |
109 |
33 |
Inadequate raptor mitigation plan/rescind 01/15/10 to write adequate mitigation plan |
58 |
Raptor |
Town of Marbleton |
sewer,water line near airport |
Install a 12 inch water line and a 6inch and 8 inch sewer line |
01/21/10 |
Granted |
2/1/10 to 7/15/10 |
2/1/10 to 7/15/10 |
WYW 176906 |
30 |
111 |
17,20 |
Install a 6 and 8 inch sewer line and a 12 inch water line. |
59 |
BG, SG |
SWEPI LP |
MS 1-27 |
completion and flowback |
02/01/10 |
Grant |
02/01/10 to 02/20/10 |
02/01/10 to 02/20/10 |
WYW 116265 |
32 |
109 |
27 |
Within Core DA2 |
60 |
SG, Raptor, FH, BO |
BP America |
Jonah field wide block exception |
exception to coa's of non-active raptor nests |
02/03/10 |
Grant Partial |
2/1/10 to 8/15/10 |
2/1/10 to 8/15/10 |
JIDPA |
|
|
|
Block exception in the Jonah Infill Drilling Project Area: drilling, completion, production, & reclamation |
61 |
SG,, BG |
SWEPI LP |
Mesa 12-28 |
construction activities, drilling, completions, facility activity |
02/08/10 |
Granted |
11/15/09 to 7/15/10 |
03/31/10 to 4/30/10 |
WYW 118165 |
32 |
109 |
28 |
Construction activities, drilling, completions, and facility activity |
62 |
SG, BG, Mbird |
Questar |
Mesa 8-19 |
Construction and dirt work activities, drilling, set surf. Casing & cem. Pipe, etc. |
02/08/10 |
Granted |
11/15/09 to 09/01/10 |
07/15/10 to 09/01/10 |
WYW 015315 |
32 |
109 |
19 |
Construction and dirt work activities, drilling, set surf. Casing & cem. Pipe, etc. |
63 |
SG, BG, FH, Raptor, BE WR |
SWEPI LP |
N LGS DA2 |
Numerous N LGS pipelines and LGS well pad hookups |
03/01/10 |
Granted |
03/01/10 to 07/31/10 |
03/01/10 to 07/31/10 |
many lease #s |
32 |
109 |
28,29,33,34 and 3, 4, 10, &11 T31. R109W |
|
64 |
SG |
BP America |
SHB 65,66,67,77,78,80-15 |
Workover rig installing tubing durring daylight hours |
03/12/10 |
Cancelled |
3/15/10 to 3/20/10 |
3/15/10 to 3/20/10 |
WYW127749 |
29 |
108 |
15 |
Workover rig installing tubing durring daylight hours |
65 |
FH |
Teppco |
CAB 15-19, CAB 17-30, SAG 73-20 |
pipeline installation |
02/22/10 |
Granted |
3/1/10 to 3/12/10 |
3/1/10 to 3/12/10 |
numerous |
29 |
107 |
20,29,30 |
pipeline installation |
66 |
SG BG CWR |
Questar |
Mesa 9-16 |
construction cellars, drill, completions production |
03/15/10 |
Granted |
03/15/10 to 07/15/10 |
03/15/10 to 07/15/10 |
WYW 015317 |
32 |
109 |
16 |
Within CDA DA 1 |
67 |
BG CWR |
SWEPI LP |
Pinedale Federal 13-19 |
excavate and backfill area with contaminated soils |
03/08/10 |
Granted |
03/08/10 to 03/14/10 |
03/08/10 to 03/14/10 |
WYW 144993 |
31 |
108 |
19 |
Within DA 3 delineation area, human/wildlife health and safety issue, finish before grouse nesting COA |
68 |
SG |
BP America |
SHB 78-15 |
extend exception dates to account for delay. Workover rig installing tubing durring daylight hours |
03/12/10 |
Denied |
3/21/10 to3/31/10 |
|
|
|
|
|
|
69 |
SG |
BP America |
SHB 24-15 |
Workover rig installing tubing durring daylight hours |
03/12/10 |
Granted |
3/15/10 to 3/23/10 |
3/15/10 to 3/23/10 |
WYW127749 |
29 |
108 |
15 |
Workover rig installing tubing durring daylight hours |
70 |
SG and BO |
SWEPI LP |
Boulder 14-32 |
coriolis meter installation and tank removal |
03/15/10 |
Granted |
03/29/10 to 04/02/10 |
03/29/10 to 04/02/10 |
WYW 144944 |
31 |
108 |
32 |
An approved wildlife monitor will be required to ensure burrowing owls are not disturbed during this activity |
71 |
Raptor,BE, BG |
Lower Valley Energy |
Wilson Sub-station power line install |
Wilson Sub-station power line install, trenching |
03/23/10 |
Granted |
4/7/10 to 5/7/10 |
4/7/10 to 5/7/10 |
WYW 176952 |
41 |
117 |
23 & 24 |
Impacts will occur but should not be much greater than impacts from the level of activity that already occurs in the area. |
72 |
SG, BG |
SWEPI LP |
Mesa 5-26 |
Pit closure |
04/15/10 |
Granted |
04/15/2010 to 06/30/2010 |
04/15/2010 to 06/30/2010 |
WYW 116265 |
32 |
109 |
26 |
|
73 |
SG |
SWEPI LP |
Boulder 8-32 |
Pit closure |
04/15/10 |
Granted |
04/15/2010 to 06/30/2010 |
04/15/2010 to 06/30/2010 |
WYW 015316 |
31 |
108 |
32 |
|
74 |
SG |
SWEPI LP |
Rainbow 13-29 |
Pit closure |
04/15/10 |
Granted |
04/15/2010 to 06/30/2010 |
04/15/2010 to 06/30/2010 |
WYW 118148 |
30 |
107 |
29 |
|
75 |
SG, BO Nesting |
SWEPI LP |
Rainbow 8-31 |
Pit closure |
04/15/10 |
Granted |
04/15/2010 to 06/30/2010 |
04/15/2010 to 06/30/2010 |
WYW 118148 |
30 |
107 |
31 |
|
76 |
SG. BO Nesting |
SWEPI LP |
Warbonnet 13-14 |
Pit closure |
04/15/10 |
Granted |
04/15/2010 to 06/30/2010 |
04/15/2010 to 06/30/2010 |
WYW 015314 |
30 |
108 |
14 |
|
77 |
SG, Raptor |
JGG |
Noble 6-24 |
Construction/installation 4531 feet of 4 in nat gas pipeline |
03/31/10 |
Granted |
05/01/2010 to 07/01/2010 |
05/01/2010 to 07/01/2010 |
WYW 178625 |
33 |
109 |
6 |
|
78 |
big game mig corridor |
Koch Construction |
James Gravel Pit |
extraction, crushing, loading, and transportation |
05/01/10 |
denied |
05/01/2010 to 11/15/2010 |
05/01/2010 to 11/15/2010 |
WYW 175450 |
34 |
111 |
21 and 28 |
|
79 |
BG CWR, Raptor, SG Nest |
M&L Marketing |
Alexander Ranch |
Topographic ground survey existing 2 track within road access easement |
04/21/10 |
Granted |
04/21/2010 to 04/21/2010 |
04/22/2010 to 04/23/2010 |
WYW 178575 |
35 |
110 |
5 |
|
80 |
SG Nesting |
Yates Petroleum Crop. |
Highway Federal 27 |
Seeding all disturbed areas using a drill on and around wellsite |
04/20/10 |
|
04/24/2010 to 04/25/2010 |
04/24/2010 to 04/25/2010 |
WYW 133050 |
29 |
107 |
9 |
|
81 |
BO |
Encana |
SHB 75-34 |
pit closure |
04/19/10 |
|
4/28/2010 to 4/30/2010 |
|
|
|
|
|
|
82 |
SG Nesting, BG CWR |
Ultra |
Mesa 10-33 |
Drilling, Completion, and Construction Operations |
04/29/10 |
Granted |
04/29/2010 to 11/29/2010 |
04/29/2010 to 11/29/2010 |
WYW 06286 |
32 |
109 |
33 |
Within DA2 Core |
83 |
BG CWR, SG Nest |
Questar |
Mesa 7-21 |
Construction, Drilling, Completion, facility, production lines, dehy facility |
04/26/10 |
|
05/01/2010 to 07/15/2011 |
05/01/2010 to 07/15/2011 |
WYW 015317,015315 |
32 |
109 |
21 |
Within CDA |
84 |
BO Nest, |
SWEPI LP |
Rainbow 8-31 |
correct erosion issues |
04/15/10 |
Granted |
04/15/2010 to 06/30/2010 |
04/15/2010 to 06/30/2010 |
WYW 118148 |
30 |
107 |
31 |
Incorrect work represented in letter, must conduct BO nest survey to conduct work |
85 |
FH Nest, BO Nest |
SWEPI LP |
Mesa 11-34 |
Pit closure |
04/21/10 |
Granted |
5/1/2010 to 06/30/2010 |
5/1/2010 to 06/30/2010 |
WYW 06286 |
32 |
109 |
34 |
|
86 |
SG Nest, BO Nest |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/01/2010 to 11/01/2010 |
05/01/2010 to 11/01/2010 |
WYW 176896 |
|
|
|
Sec 7,8,18,19,29,30,32,33 T31 R108; Sec 11,12,13,24, T31, R109;Sec 4, T30 R 108 |
87 |
SG Nest, BO Nest |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/15/2010 |
05/03/2010 to 11/15/2010 |
WYW 178617 and 178619 TUP |
|
|
|
Sec 24 T 31 R109; Sec 19, T31 R108 |
88 |
SG Nest, Raptor Nest, BE Nest |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178598 |
|
|
|
Sec 13, 24, T31 R109; Sec 7, 18 T31 R108 |
89 |
SG Nest, Raptor, BO, MP |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178599 |
|
|
|
Sec 12, 13, 24, T31 R109 |
90 |
SG Nest, BO Nest |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/15/2010 |
05/03/2010 to 11/15/2010 |
WYW 178601 |
|
|
|
Sec 18, 19 T31 R108 |
91 |
SG Nest, BO Nest |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/15/2010 |
05/03/2010 to 11/15/2010 |
WYW 178602 |
31 |
108 |
19 |
|
92 |
SG Nest, MP, Raptor |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178603 |
|
|
|
Sec 13, 14, 23, 24, 25 T31 R109 |
93 |
SG, MP, BO, Raptor |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178604 |
|
|
|
Sec 13, 14, 24, 25, T31 R109; Sec 19, T31, R108 |
94 |
SG, MP, BO |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178613 |
|
|
|
Sec 24, 25, T31, R109; Sec 19, 29, 30, 31, 32 T31 R108; Sec 5 and 6 T30 R108 |
95 |
SG, MP |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178614 |
|
|
|
Sec 24, 25, T31, R109; Sec 19, 29, 30, 31, 32 T31 R108; Sec 5 and 6 T30 R108 |
96 |
SG, MP, BO |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178616 |
|
|
|
Sec 13, 14, 24, 25, T31 R109; Sec 7, 18, 19,30, 31, 32 T31, R108; Sec 4, 6, T30 R108 |
97 |
SG Nest, Raptor, BE Nest |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
WYW 178912 |
|
|
|
Sec 7,8,18, T31 R108 |
98 |
SG Nest, Raptor, BO |
Ultra |
Boulder CGF #2 |
LGS Pipeline Installation |
04/23/10 |
Granted |
05/03/2010 to 11/01/2010 |
05/03/2010 to 11/01/2010 |
|
33 |
31 |
108 |
|
99 |
SG Nest, raptor, BO |
SWEPI LP |
DA3 Coriolis meter install |
install coriolis meters on 7 pads |
06/07/10 |
Granted |
06/07/2010 to 08/15/2010 |
06/07/2010 to 08/15/2010 |
WYW 06269, 026025, 144933 |
|
|
|
Sec 13, 14, 23, 24, and 25 T31 R109 Sec 19 T31 R108 |
100 |
BG CWR, SG Nest,Raptor |
Ultra |
Mesa 12-27 |
Drill pipe inspection, 3-5 days, daylight operations |
05/27/10 |
Granted |
05/28/2010 to 06/02/2010 |
05/28/2010 to 06/02/2010 |
WYW06286 |
32 |
109 |
27 |
FH 42 and 77 have been inactive this year |
101 |
BG CWR, SG Nest,Raptor |
Ultra |
Mesa 4-34 |
Drilling, Completion, production, pipeline and Construction Operations |
05/27/10 |
Granted |
07/01/2010 to 02/28/2011 |
07/01/2010 to 02/28/2011 |
WYW 06286 |
32 |
109 |
34 |
FH 77 has been inactive this year |
102 |
SG Nest, Raptor |
SWEPI LP |
T-4 SW and T-4 RW,T-9-RW |
Install ground water study wells-extension |
05/26/10 |
Granted |
06/01/2010 to 07/02/2010 |
06/01/2010 to 07/02/2010 |
WYW 176989,WYW 141753 |
|
|
|
Sec 11 and 12, T31N, R109W, Sec 13, T30N, R107W |
103 |
SG Nest, BG CWR, Raptor |
Rocky Mountain Power |
Paradise substation and DE |
earthwork, excavation of topsoil, construction of substation |
05/27/10 |
Granted for alternate dates |
06/10/2010 to 11/10/2010 |
07/31/2010 to 12/31/2010 |
WYW 175432, 172153, 176892, 178578 |
31 |
109 |
4 and9 |
FH 84 has chicks, this area is in DA2 which relieves operators from BG CWR COAs |
104 |
SG Nest, Raptor, BO Nest |
Ultra |
Warbonnet wells |
Reclamation |
05/27/10 |
Granted |
06/04/2010 to 06/30/2010 |
06/04/2010 to 06/30/2010 |
WYW 016161, 025314, 015316, 144994, 016162, 18039 |
|
|
|
|
105 |
SG Nest |
Questar |
SP 14-32 |
Construction, setting trench boxes, install cellars, install lines, move drill rig |
06/07/10 |
Deny |
07/01/2010 to 07/15/2010 |
|
WYW 015315 |
32 |
109 |
14 |
Sage grouse females & chicks are still using the nexting habitats. |
106 |
SG Nest, BG CWR, FH raptor, Raptor |
Ultra |
Mesa 10-35 |
Drilling, Completion, production, pipeline, construction |
06/02/10 |
Grant |
07/01/2010 to 05/30/2011 |
07/01/2010 to 05/30/2011 |
WYW 06286 |
32 |
109 |
35 |
|
107 |
bg cwr, sg nest |
Ultra |
Mesa 3-27 |
Drilling, Completion, production, pipeline, construction |
06/10/10 |
Grant |
06/15/2010 to 07/15/2011 |
06/15/2010 to 07/15/2011 |
WYW 06286 |
32 |
109 |
27 |
|
108 |
sg nest,bo nest |
JGG |
Water monitoring well |
Install one water monitoring well, small water well drill rig drill 30ft, casing install and cement |
06/15/10 |
Partial grant |
06/29/2010 tp 07/27/2010 |
07/15/2010 to 08/01/2010 |
WYW 175472 AM #1 |
30 |
108 |
35 |
Location within PDA DA 5 within 1 mile The Rocks SG Lek, BO nest has been inactive in last 3 years |
109 |
sg nest |
SWEPI |
Mesa 12-28 |
Drill 3 clusters (16 wells) of conductors |
06/17/10 |
Grant |
07/01/2010 to 08/01/2010 |
07/01/2010 to 08/01/2010 |
WYW 118165 |
32 |
109 |
28 |
Location within DA 2 core |
110 |
sg nest |
SWEPI |
Stewart Point LGS pipeline tie in |
construct LGS associated with Stewart Point Tie in, Wyoming one call set pin flags for construction |
06/23/10 |
Partial grant |
06/23/2010 to 07/15/2010 |
06/23/2010 to 07/10/2010 |
WYW 176950 am1, 176951 am1, 178597 |
32 |
109 |
6,7,8,15,17,21,28 |
Only the walking survey from the Wyoming one call is permitted. |
111 |
SG Nest, FH Nest |
Rocky Mnt Power |
Paradise Substation Des |
Foundation for transmission dead ends |
06/03/10 |
Grant |
06/24/2010 to 07/31/2010 |
06/24/2010 to 07/31/2010 |
WYW 175432, 172153, |
31 |
109 |
4,9 |
This action will only take 2 days with a special auger and cement truck, minimal disturbance. |
112 |
SG Nest |
Ultra |
Water monitoring well |
Anticline water monitoring well |
06/24/10 |
Grant |
07/06/2010 to 07/15/2010 |
07/06/2010 to 07/15/2010 |
WYW 015314 |
30 |
108 |
15 |
Completion of this action was delayed due to occurrence of methane vapors and the drill hole caving. |
113 |
SG Nest |
SWEPI |
Water monitoring well |
Anticline water monitoring well |
06/24/10 |
Grant |
07/06/2010 to 07/15/2010 |
07/06/2010 to 07/15/2010 |
WYW 141753 |
29 |
107 |
10 |
Adding and additional study well to this location |
114 |
Burr Owl Nest |
Encana |
JF 30-8, 31-8, 18-8 |
Reclaim Pads |
06/28/10 |
Grant |
7/1/12010 to 8/15/2010 |
7/1/2010 to 8/15/2010 |
WYW 125944 |
28 |
108 |
NE 1/4 of 8 |
Exception granted unless owls return |
115 |
Burr Owl Nest |
JGG |
Cabot TOT #1 |
Install 1996 foot pipeline & assorted facilities |
06/28/10 |
Grant |
7/1/12010 to 8/15/2010 |
7/1/2010 to 8/15/2010 |
WYW 178647 |
28 |
109 |
SW 1/4 of 15 |
Exception granted unless owls return |
116 |
BE Nest, BO Nest |
Ultra |
RS to RB Water Line |
LGS Pipeline Installation |
07/07/10 |
|
08/01/10 to 11/01/10 |
|
WYW 178649 and 178650TUA |
31 |
109 |
8, 17, 19 ,20, 30, 31, 32 |
Exception pending Burrowing owl nesting survey |
117 |
SG Nesting, BO and raptor Nest |
Ultra |
RS 3-13, RS 15-14, BO 16-18, BO 4-33, BR 10-33, WB 5-12, WB 12-12, WB 4-23, WB 6-23, WB 7-23, WB 3-22, WB 13-23, WB 5-24, WB 4-25 |
Reclamation |
06/23/10 |
Partial grant |
07/01/10 to 07/31/10 |
07/09/10 to 07/31/10 |
WYW 06269, 172598, 015316, 118159, 016161, 015314, 018039, 118157, 016158 |
|
|
|
|
118 |
FH Nest, BG CWR, BE Nest |
Rocky Mnt Power |
Paradise Substation and Upper Green Paradise 230 kV trans line |
Augering a hole for the 6/21 structure and placing the structure in the augered hole. Surface disturbance of the substation, begin construction of substation. |
07/20/10 |
Grant |
07/26/10 to 12/26/10 |
07/26/10 to 12/26/10 |
WYW 175423, 176892, 172153, 178578 |
31 |
109 and 110 |
4, 9, 27 |
most of activities are being conducted at the end of the raptor nesting season, the fledglings are nearly ready to leave the territory, they have been hunting with the adults within the territory |
|